留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码

基于DSM优化的产品开发两因素风险建模及仿真

张汉鹏 邱菀华

张汉鹏, 邱菀华. 基于DSM优化的产品开发两因素风险建模及仿真[J]. 北京航空航天大学学报, 2007, 33(05): 627-630.
引用本文: 张汉鹏, 邱菀华. 基于DSM优化的产品开发两因素风险建模及仿真[J]. 北京航空航天大学学报, 2007, 33(05): 627-630.
Zhang Hanpeng, Qiu Wanhua. Product development two-factor risk model and simulation based on DSM[J]. Journal of Beijing University of Aeronautics and Astronautics, 2007, 33(05): 627-630. (in Chinese)
Citation: Zhang Hanpeng, Qiu Wanhua. Product development two-factor risk model and simulation based on DSM[J]. Journal of Beijing University of Aeronautics and Astronautics, 2007, 33(05): 627-630. (in Chinese)

基于DSM优化的产品开发两因素风险建模及仿真

基金项目: 国家自然科学基金资助项目(70372011)
详细信息
    作者简介:

    张汉鹏(1977-),男,山东德州人,博士生,zhp@sem.buaa.edu.cn.

  • 中图分类号: TH 166

Product development two-factor risk model and simulation based on DSM

  • 摘要: 针对存在迭代现象的产品开发过程的风险综合测量问题,建立了风险分析模型,并给出了相应的仿真算法.该模型分2个阶段构建,首先在传统设计结构矩阵理论基础上,构建了返工概率矩阵和返工冲击矩阵,由此描述产品开发过程中的进度和成本与迭代的关系;然后根据初始进度和成本不确定性、迭代的不确定性以及构建的结构矩阵,给出了产品开发风险评估模型.同时,利用传统设计结构矩阵优化理论,提出了通过减少迭代降低进度和成本风险的思路.利用仿真实例阐明,该模型能够测量产品开发进度和成本风险,同时能够利用设计结构矩阵优化开发顺序,从而降低产品开发风险,这为测量和控制产品开发项目综合风险提供了科学的依据.

     

  • [1] 徐哲,冯允成.网络计划进度的风险分析[J].系统工程理论与实践,1998,4:24-28 Xu Zhe, Feng Yuncheng. Schedule risk analysis for network planning[J]. System Engineering-Theory & Practice, 1998,4:24-28(in Chinese) [2] 钟登华,刘奎建,杨晓刚.施工进度计划柔性网络仿真的不确定性研究[J].系统工程理论与实践,2005,2:107-112 Zhong Denghua, Liu Kuijian, Yang Xiaogang. Uncertainty analysis for construction scheduling with flexible network simulation[J]. System Engineering-Theory & Practice, 2005,2:107-112(in Chinese) [3] 刘煜明,王卓甫,丁尔俊.基于一定风险水平的施工进度计划研究[J],河海大学学报(自然科学版),2006,3:227-230 Liu Yuming, Wang Zhuofu, Ding Erjun. Scheduling for construction under fixed risk probability[J]. Journal of Hehai University(Natural Sciences), 2006,3:227-230(in Chinese) [4] Browning T R. Use of dependency structure matrices for product development cycle time reduction Proceeding of the Fifth ISPE International Conference on Concurrent Engineering:Research and Applications.Tokyo:Tokyo Metroplitan Insititute of Technology,1998:89-96 [5] Browning T R, Eppinger S D. Modeling impacts of process architecture on cost and schedule risk in product development[J]. IEEE Transactions on Engineering Management, 2002, 49(4):428-443 [6] 姚咏,范文慧,熊光楞.复杂产品开发过程仿真及其优化方法研究[J].系统仿真学报,2006,3:726-730 Yao Yong, Fan Wenhui, Xiong Guangleng. Research on complex product development process simulation and its optimization[J]. Journal of System Simulation, 2006,3:726-730(in Chinese) [7] Altus S S, Kroo I M, Gage P J. A genetic algorithm for scheduling and decomposition of multidisciplinary design problems[J]. Transactions of the ASME, 1996, 118(4):486-489
  • 加载中
计量
  • 文章访问数:  2966
  • HTML全文浏览量:  96
  • PDF下载量:  909
  • 被引次数: 0
出版历程
  • 收稿日期:  2006-06-15
  • 网络出版日期:  2007-05-31

目录

    /

    返回文章
    返回
    常见问答