Li Xingmei, Qi Jianxun, Su Zhixiong, et al. Single-factor uncertainty analysis of project-s duration based on float[J]. Journal of Beijing University of Aeronautics and Astronautics, 2007, 33(12): 1466-1470. (in Chinese)
Citation: Li Xingmei, Qi Jianxun, Su Zhixiong, et al. Single-factor uncertainty analysis of project-s duration based on float[J]. Journal of Beijing University of Aeronautics and Astronautics, 2007, 33(12): 1466-1470. (in Chinese)

Single-factor uncertainty analysis of project-s duration based on float

  • Received Date: 30 Dec 2006
  • Publish Date: 31 Dec 2007
  • In order to analyze the sensitivity of variety of single activity completion time to project-s duration, by probabilistic analysis principle and approach, the probability of terminative time-s change of activity under different conditions was confirmed, and the system of decision evaluation index was designed which contains the method of confirming correlative parameters in the system on the basis of total float theorem. The sensitivity of variety of critical activity-s completion time to project-s duration was analyzed with the analysis technique of single-factor sensitivity, and how to select critical activities which are the most sensitive to total time limit from all activities considered. Finally the process was validated and illuminated by illustrating. The system is helpful to supervise and control the sensitive activity to project duration, and contribute to project scheduling and planning, which establishs theoretic foundation for analyzing multi-factor uncertainty problem of project-s duration.

     

  • loading
  • [1] Elmaghraby S E. On criticality and sensitivity in activity networks [J]. European Journal of Operational Research, 2000, 127:220-238 [2] Dodin B M, Elmaghraby S E. Approximating the criticality indices of the activities in PERT networks [J]. Management Science, 1985, 31:207-223 [3] Kulkarni V G, Adlakha V G. Markov and Markov-regenerative pert networks [J]. Operations Research, 1986, 34:769-781 [4] Bowman R A, Muckstadt J A. Stochastic analysis of cyclic schedules [J]. Operations Research, 1993, 41:947-958 [5] Sigal C E, Pritsker A B, Solberg J. Use of cutsts in Monte Carlo analysis of stochastic networks [J]. Mathematics and Computers in Simulation, 1979, 21: 376-384 [6] Bowman R A. Efficient estimation of arc criticalities in stochastic activity networks [J]. Management Science, 1995, 41:58-67 [7] Williams T M. Criticality in stochastic networks [J]. Operations Research, 1992, 43:353-357 [8] Cho J G, Yum B J. An uncertainty importance measure of activities in PERT networks [J]. International Journal of Production Research, 1997, 35: 2737-2770 [9] 乞建勋. 网络计划优化新理论与技术经济决策[M]. 北京: 科学出版社, 1997:16-25 Qi Jianxun. New theory of network planning and technical economic decision-making [M]. Beijing: Science Press, 1997:16-25 (in Chinese) [10] 李星梅, 乞建勋, 牛东晓. 三个平行序链的顺序优化决策[J]. 中国管理科学, 2006, 14(4):69-74 Li Xingmei, Qi Jianxun, Niu Dongxiao. Optimization decision-making of three parallel activity-chains [J]. Chinese Journal of Management Science, 2006, 14(4):69-74(in Chinese)
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views(3398) PDF downloads(875) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return