[1] SHERBROOKE C C.METRIC:A multi-echelon technique for recoverable item control[J].Operations Research,1968,16(1):122-141.
[2] SHERBROOKE C C.Optimal inventory modeling of systems:Multi-echelon techniques[M].Amsterdam:Springer Science & Business Media,2006.
[3] LEVNER E,PERLMAN Y,CHENG T C E,et al.A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand[J].International Journal of Production Economics,2011,132(1):43-51.
[4] SAMOUEI P,KHEIRKHAH A S,FATTAHI P.A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount[J].Annals of Operations Research,2015,226(1):551-563.
[5] COSTANTINO F,DI GRAVIO G,TRONCI M.Multi-echelon,multi-indenture spare parts inventory control subject to system availability and budget constraints[J].Reliability Engineering & System Safety,2013,119:95-101.
[6] TOPAN E,BAYINDIR Z P.Multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse under compound Poisson demand[J].Journal of the Operational Research Society,2012,63(8):1143-1152.
[7] WONG H,VAN HOUTUM G J,CATTRYSSE D,et al.Multi-item spare parts systems with lateral transshipments and waiting time constraints[J].European Journal of Operational Research,2006,171(3):1071-1093.
[8] WONG H,KRANENBURG B,VAN HOUTUM G J,et al.Efficient heuristics for two-echelon spare parts inventory systems with an aggregate mean waiting time constraint per local warehouse[J].OR Spectrum,2007,29(4):699-722.
[9] WONG H,VAN HOUTUM G J,CATTRYSSE D,et al.Simple,efficient heuristics for multi-item multi-location spare parts systems with lateral transshipments and waiting time constraints[J].Journal of the Operational Research Society,2005,56(12):1419-1430.
[10] TOPAN E,BAYINDIR Z P,TAN T.An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse[J].Operations Research Letters,2010,38(5):454-461.
[11] WONG H,CATTRYSSE D,VAN OUDHEUSDEN D.Inventory pooling of repairable spare parts with non-zero lateral transshipment time and delayed lateral transshipments[J].European Journal of Operational Research,2005,165(1):207-218.
[12] TIACCI L,SAETTA S.Reducing the mean supply delay of spare parts using lateral transshipments policies[J].International Journal of Production Economics,2011,133(1):182-191.
[13] PATERSON C,KIESMVLLER G,TEUNTER R,et al.Inventory models with lateral transshipments:A review[J].European Journal of Operational Research,2011,210(2):125-136.
[14] FISHER W W.Markov process modelling of a maintenance system with spares,repair,cannibalization and manpower constraints[J].Mathematical and Computer Modelling,1990,13(7):119-125.
[15] EYNAN A.The multi-location inventory centralization problem with first-come,first-served allocation[J].European Journal of Operational Research,1999,114(1):38-49.
[16] 蔡芝明,金家善,李广波.多约束下随船备件配置优化方法[J].系统工程理论与实践,2015,35(6):1561-1566.CAI Z M,JIN J S,LI G B.Warship spare parts allotment optimization method under multi-constraints[J].Systems Engineering-Theory & Practice,2015,35(6):1561-1566(in Chinese).
[17] 刘任洋,李庆民,李华.基于横向转运策略的可修件三级库存优化模型[J].航空学报,2014,35(12):3341-3349.LIU R Y,LI Q M,LI H.Optimal model of three-echelon inventory for repairable spare parts with lateral transshipments strategy[J].Acta Aeronautica et Astronatica Sinica,2014,35(12):3341-3349(in Chinese).
[18] LI Y Y.The big data:Check the smart ship time[EB/OL].Beijing:Economic Daily News,2014(2014-10-20)[2016-01-04].http://www.ce.cn/xwzx/gnsz/gdxw/201410/20/t20141020_3730494.shtml. |