[1] 任敏,陈全庆,沈震,等.备件供应学[M].北京:国防工业出版社,2013:278-289.REN M,CHEN Q Q,SHEN Z,et al.Spare parts supply[M].Beijing:National Defence Industry Press,2013:278-289(in Chinese).
[2] SHERBROOKE C C.Metric:A multi-echelon technique for recoverable item control[J].Operations Research,1968,16(1):122-141.
[3] MUCKSTADT J A.A model for a multi-item multi-echelon multi-indenture inventory system[J].Management Science,1973,20(4):472-481.
[4] SHERBROOKE C C.VARI-METRIC:Improved approximations for multi-indenture multi-echelon availability models[J].Operations Research,1986,34(2):311-319.
[5] AXSATER S.A new decision rule for lateral transshipments in inventory systems[J].Management Science,2003,49(9):1168-1179.
[6] 王慎,李庆民,彭英武,等.串件拼修对策下两级备件维修供应系统动态管理模型[J].航空学报,2013,34(6):1326-1335.WANG S,LI Q M,PENG Y W,et al.Dynamic management model of two-echelon maintence supply system for spare parts with cannibalization[J].Acta Aeronautica et Astronautica Sinica,2013,34(6):1326-1335(in Chinese).
[7] SLEPTCHENKO A,VAN DER HEIJDEN M C,VAN HARTEN A.Effects of finite repair capacity in multi-echelon,multi-indenture service part supply systems[J].International Journal of Production Economics,2002,79(3):209-230.
[8] 聂涛,盛文.K:N系统可修复件两级供应保障优化研究[J].系统工程与电子技术,2010,32(7):1452-1455.NIE T,SHENG W.Research on two-echelon supply support optimizing for repairable spare parts of K:N system[J].Systems Engineering and Electronics,2010,32(7):1452-1455(in Chinese).
[9] ISAACSON B.Dynametric version 4:A capability assessment model including constrained repair and management adaptations:R3389AF[R].Santa Monica:The RAND Corperation,1988.
[10] SLAY F,BACHMAN T C,KLINE R C,et al.Optimizing spares support:The aircraft sustainability model:AF501MR1 s[R].Virginia:Logistics Management Institute,1996.
[11] LAU H C,SONG H,SEE T C,et al.Evaluation of time-varying availability in multi echelon spare parts systems with passivation[J].European Journal of Operational Research,2006,170(1):91-105.
[12] 徐立,李庆民,李华,等.有限维修能力下作战单元时变可用度评估模型[J].国防科技大学学报,2016,38(1):114-121.XU L,LI Q M,LI H,et al.Evaluation model of time-varying availability for combat units under finite repair capacity[J].Journal of National University of Defense Technology,2016,38(1):114-121(in Chinese).
[13] 周亮,彭英武,李庆民,等.串件拼修策略下不完全修复件可用度评估建模[J].系统工程与电子技术, 2017,39(5):1065-1071.ZHOU L,PENG Y W,LI Q M,et al.Time-varying availability evaluation modeling of incomplete repair parts under cannibalization[J].Systems Engineering and Electronics,2017,39(5):1065-1071(in Chinese).
[14] 蔡芝明,金家善,陈砚桥,等.非稳态及多约束下多层级系统器材配置优化方法[J].北京航空航天大学学报,2017,43(1):36-46.CAI Z M,JIN J S,CHEN Y Q,et al.Optimization method of multi-echelon system equipment configuration under unsteady state and multi-constraint[J].Journal of Beijing University of Aeronautics and Astronautics,2017,43(1):36-46(in Chinese).
[15] 周亮,李庆民,王睿,等.K/N(G)冗余结构下随舰备件配置方案[J].系统工程与电子技术,2015,37(12):2785-2790.ZHOU L,LI Q M,WANG R,et al.Spare parts allocation scheme with ship for K/N(G) redundant structure[J].Systems Engineering and Electronics,2015,37(12):2785-2790(in Chinese).
[16] SHERBROOKE C C.Optimal inventory modeling of systems multi-echelon techniques[M].2nd ed.Boston:Artech House,2004.
[17] 周亮,彭英武,李庆民,等.面向任务的备件保障评估通用模型研究[J].系统工程与电子技术,2017,39(9):2046-2051.ZHOU L, PENG Y W, LI Q M,et al.Research on the general evaluation model of task oriented spare parts supply[J].Systems Engineering and Electronics,2017,39(9):2046-2051(in Chinese).
[18] 李华,李庆民,刘任洋.任务期内多层级不完全修复件的可用度评估[J].系统工程与电子技术,2016,38(2):476-480.LI H,LI Q M,LIU R Y.Evaluation of availability for multi-indenture partial repairable spares during the mission[J].Systems Engineering and Electronics,2016,38(2):476-480(in Chinese). |