[1] KAPUR K C,LAMBERSON L R.Reliability in engineering design[M].Washington,D.C.:John Wiley & Sons,1977:405-414.
[2] KECECIOGLU D.Reliability engineering handbook[M].2nd ed.Englewood:PTR Prentice Hall,1991:363-399.
[3] CLEMENT L M.Reliability of military electronic equipment[J].Journal of the British Institution of Radio Engineers 1956,16(9):488-495.
[4] FALCONE D,SILVESTRI A,BONA D.Integrated factor method (IFM):A new reliability allocation technique[C]//Proceedings of the IASTED International Conference on Software Engineering and Applications,2002:166.
[5] SILVESTRI A,FALCONE D,BONA G D,et al.A new method for reliability allocation:Critical flow method[J].Lecture Notes in Control & Information Sciences,2015,20:249-261.
[6] CHANG Y C,CHANG K H,LIAW C S.Innovative reliability allocation using the maximal entropy ordered weighted averaging method[J].Computers & Industrial Engineering,2009,57(4):1274-1281.
[7] AMARI S V,HEGDE V.New allocation methods for repairable systems[C]//Reliability & Maintainability Symposium.Piscataway:IEEE Press,2006:290-295
[8] 冯川,汪文峰,杨建军.使用可用度分配模型研究[J].电子产品可靠性与环境试验,2009,27(6):49-53.FENG C,WANG W F,YANG J J.Research on the use of availability allocation model[J].Electronic Product Reliability and Environmental Testing,2009,27(6):49-53(in Chinese).
[9] ELEGBEDE C,ADJALLAH K.Availability allocation to repairable systems with genetic algorithms:A multi-objective formulation[J].Reliability Engineering & System Safety,2003,82(3):319-330.
[10] DUGAN J B.Automated analysis of phased-mission reliability[J].IEEE Transactions on Reliability,1991,40(1):45-52.
[11] TESSERON J M.Mission:Reliability[J].Power & Energy Magazine IEEE,2008,6(1):42-48.
[12] GHODRATI B,KUMAR U.Reliability and operating environment-based spare parts estimation approach[J].Journal of Quality in Maintenance Engineering,2005,11(2):169-184.
[13] 张志华,应新雅,费广玉.串联系统备件满足率分配及配置优化[J].系统工程理论与实践,2015,35(11):2987-2992.ZHANG Z H,YING X Y,FEI G Y.Spare part rate allocation and configuration optimization of series system[J].Systems Engineering-Theory & Practice,2015,35(11):2987-2992(in Chinese).
[14] CHEN C H,YANG Z J,CHEN F,et al.The study of reliability modeling of machining center based on Blocksim and Weibull++[J].Applied Mechanics & Materials,2013,274:49-52.
[15] CARLUCCI E,TOGNARELLI L.Mixed Weibull distribution as best representative of forced outage distribution to be implemented in BlockSim[C]//ASME 2014 Power Conference.New York:ASME,2014:V001T06A009. |