[1] 刘翱,刘克.舰载机保障作业调度问题研究进展[J].系统工程理论与实践,2017,37(1):49-60.LIU A,LIU K.Advances in carrier-based aircraft deck operation scheduling[J].Systems Engineering-Theory & Practice,2017,37(1):49-60(in Chinese). [2] ROSS W.Investigating the tradespace between increased automation and optimal manning on aircraft carrier decks[D].Durham:Duke University,2016. [3] RYAN J C,BANERJEE A G,CUMMINGS M L,et al.Comparing the performance of expert user heuristics and an integer linear program in aircraft carrier deck operations[J].IEEE Transactions on Cybernetics,2014,44(6):761-773. [4] RYAN J C,CUMMINGS M L,ROY N,et al.Designing an interactive local and global decision support system for aircraft carrier deck scheduling:AIAA-2011-1516[R].Reston:AIAA,2011. [5] 苏析超,韩维,萧卫,等.基于Memetic算法的舰载机舰面一站式保障调度[J].系统工程与电子技术,2016,38(10):2303-2309.SU X C,HAN W,XIAO W,et al.Pit-stop support scheduling on deck of carrier plane based on Memetic algorithm[J].Systems Engineering and Electronics,2016,38(10):2303-2309(in Chinese). [6] YU L F,ZHU C,SHI J M,et al.An extended flexible job shop scheduling model for flight deck scheduling with priority,parallel operations,and sequence flexibility[J].Scientific Programming,2017,2017(1):1-15. [7] 魏昌全,陈春良,王保乳.基于空间约束的舰载机航空保障调度研究[J].控制工程,2013,20(4):699-702.WEI C Q,CHEN C L,WANG B R.Study of aircraft support scheduling of aircraft on carrier based on space restriction[J].Control Engineering of China,2013,20(4):699-702(in Chinese). [8] 刘钦辉,邱长华,王能建.考虑空间约束的舰载机作业调度模型研究[J].哈尔滨工程大学学报,2012,33(11):1435-1439.LIU Q H,QIU C H,WANG N J.Study on ship-based aircraft operation scheduling model considering spatial restriction[J].Journal of Harbin Engineering University,2012,33(11):1435-1439(in Chinese). [9] WU Y,WANG Y,QU X J,et al.Exploring mission planning method for a team of carrier aircraft launching[J].Chinese Journal of Aeronautics,2019,32(5):203-214. [10] SU X C,HAN W,WU Y,et al.A proactive robust scheduling method for aircraft carrier flight deck operations with stochastic durations[J].Complexity,2018,2018:6932985. [11] FENG Q,LI S,SUN B.A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel[J].Chinese Journal of Aeronautics,2014,27(2):280-290. [12] 崔博.舰载机保障人员配置优化仿真研究[D].哈尔滨:哈尔滨工程大学,2016.CUI B.Research on simulation and allocation optimization of support personnel of carrier-based aircraft[D].Harbin:Harbin Engineering University,2016(in Chinese). [13] 郭小威,马登武,邓力.基于PERT网络的航空弹药保障人员优化配置[J].北京航空航天大学学报,2014,40(1):69-74.GUO X W,MA D W,DENG L.Optimal allocation of air ammunition support crew based on PERT networks[J].Journal of Beijing University of Aeronautics and Astronautics,2014,40(1):69-74(in Chinese). [14] 敬军.国内装备维修保障资源优化技术研究综述[J].中国舰船研究,2013,8(4):116-122.JING J.Optimization techniques for equipment maintenance support resources in China:A literature review[J].Chinese Journal of Ship Research,2013,8(4):116-122(in Chinese). [15] 郭霖瀚,康锐,文佳.以保障活动为中心的装备保障资源数量预测[J].航空学报,2009,30(5):919-924.GUO L H,KANG R,WEN J.Quantitative forecast of support activity centered equipment support resources[J].Acta Aeronautica et Astronautica Sinica,2009,30(5):919-924(in Chinese). [16] BELIË J,DEMEULEMEESTER E,BRUECKER P D,et al.Integrated staffing and scheduling for an aircraft line maintenance problem[J].Computers & Operations Research,2013,40(4):1023-1033. [17] 杨甫勤,夏军剑,路学成.出动强度约束下多机种(型)保障资源优化配置[J].军事交通学院学报,2016,18(11):59-62.YANG F Q,XIA J J,LU X C.Resources optimal allocation of multi-aircraft support under constraint of sortie rate[J].Journal of Military Transportation University,2016,18(11):59-62(in Chinese). [18] SHARMA P,KULKARNI M S,YADAV V.A simulation based optimization approach for spare parts forecasting and selective maintenance[J].Reliability Engineering & System Safety,2017,168:274-289. [19] 赵建忠,李海军,叶文,等.改进系统备件满足率约束下的备件优化配置建模[J].兵工学报,2013,34(9):1187-1192.ZHAO J Z,LI H J,YE W,et al.Optimization configuration modeling of spare parts under constraint of improved system spare part fill rate[J].Acta Armamentarii,2013,34(9):1187-1192(in Chinese). [20] KADRI R L,BOCTO F F.An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times:The single mode case[J].European Journal of Operational Research,2018,265(2):454-462. [21] LI J,PAN Q.Solving the large-scale hybrid flow shop scheduling problem with limited buffers by a hybrid artificial bee colony algorithm[J].Information Sciences,2015,316:487-502. [22] FAHMY A,HASSAN T M,BASSIONI H.Improving RCPSP solutions quality with stacking justification-application with particle swarm optimization[J].Expert Systems with Applications,2014,41(13):5870-5881. [23] JIA Q,SEO Y.An improved particle swarm optimization for the resource-constrained project scheduling problem[J].The International Journal of Advanced Manufacturing Technology,2013,67(9-12):2627-2638. [24] WANG L,FANG C.A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem[J].Expert Systems with Applications,2012,39(3):2451-2460. |