Optimized evaluation point designing for R&D project
Wang Jing1, Xi Yang2, Han Yong3*
1. School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100083, China;
2. School of Management, Beijing University of Science and Technology, Beijing 100083, China;
3. Ordering Office of Equipping Department of the Air Force, Beijing 100843, China

ժҪ
�����
�������
Download: PDF (0KB)   HTML 1KB   Export: BibTeX or EndNote (RIS)      Supporting Info
ժҪ ���¹������ƹ����ձ�����˲��й��̵ķ���,��Ȼ����ȵ������˹���,��������սϸ�.ͨ���������й���ʵʩ���ղ�����ԭ��,�����˲��й���ʵʩ���̵�һ�����ģ��,ָ�����ž��ߵ�λ��"ʱ��-����"��ϵ������"����-���������"��ϵ���ߵĽ����,�����˸��¹�����Ŀ���ƹ����еķ��շ���.���������Ч��������ǽ���ʵʩ���й���������յĿ��з���,�����������������ȷ������,���ü����������ӡ����ȷ������ӺͲ��з��������������������մ�С,�ټӺ������Ŀ�������.ͨ��ʵ��˵����������������ƿ�����Ч������Ŀ���������.
Service
�ѱ����Ƽ�������
�����ҵ����
�������ù�����
Email Alert
RSS
�����������
�ؼ����� �������   ����   ���й���   ���������     
Abstract�� Having been widely adopted in the management of research and development (R&D) projects, concurrent engineering can largely shorten the time limits for projects, however, its risk is higher. A risk model of implementing concurrent engineering was built. The optimum decision point is exactly the intersection between the "risk versus technological-maturity" relation curve and the "time versus risk" relation curve, and the classification of risks in R&D projects was proposed. Setting valid evaluation point is effective to control and reduce the risks, and a method to identify the optimized evaluation points was designed. In the method, the risks of each task can be determined by technological risk factors, scheduling risk factors and parallel risk factors, and then the overall risk of the project can be determined by the summation of all the risk values. A numerical example was used to demonstrate that the overall risk of R&D projects can be effectively reduced through the optimized evaluation point designing.
Keywords�� optimum design   risk   concurrent engineering   optimized evaluation point     
Received 2003-11-25;
Fund:

���ջ�����ѧ����������Ŀ(03J51054)

About author: �� ��(1960-),��,������,����, pekwjing@pbulic.bta.net.cn.
���ñ���:   
����, ϯ��, ����.���¹�����Ŀ���ƹ����е�������������[J]  �������պ����ѧѧ��, 2005,V31(05): 556-560
Wang Jing, Xi Yang, Han Yong .Optimized evaluation point designing for R&D project[J]  JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND A, 2005,V31(05): 556-560