[1] 拓耀飞,陈建军,陈永琴.区间参数弹性连杆机构的非概率可靠性分析[J].中国机械工程,2007,18(5):528-563.TUO Y F,CHEN J J,CHEN Y Q.Non-probabilistic reliability analysis of elastic linkage mechanism with interval parameters[J].China Mechanical Engineering,2007,18(5):528-563(in Chinese).
[2] TUO Y F,CHEN J J,ZHANG C J,et al.Reliability analysis of kinematic acuuracy for the elastic slider-crank mechanism[J].Frontiers of Mechanical Engineering in China,2007,2(2):214-217.
[3] 董玉革,陈心昭,赵显德,等.模糊可靠性理论在机构运动可靠性分析中的应用[J].应用科学学报,2002,20(3):316-320.DONG Y G,CHEN X Z,ZHAO X D,et al.An application of fuzzy reliability theory in the reliability analysis of mechanism movement[J].Journal of Applied Sciences,2002,20(3):214-217(in Chinese).
[4] 张义民,黄贤振,贺向东,等.不完全概率信息牛头刨床机构运动精度可靠性稳健设计[J].机械工程学报,2009,45(4):105-109.ZHANG Y M,HUANG X Z,HE X D,et al.Reliability-based robust design for kinematic accuracy of the shaper mechanism under incomplete probability information[J].Journal of Mechanical Engineering,2009,45(4):105-109(in Chinese).
[5] 张义民,黄贤振,贺向东.任意分布参数平面连杆机构运动精度可靠性稳健设计[J].农业机械学报,2008,39(7):139-143.ZHANG Y M,HUANG X Z,HE X D.Reliability-based robust design for kinematic accuracy of the planar linkage mechanism with arbitrary distribution parameters[J]Transactions of the Chinese Society for Agricultural Machinery,2008,39(7):139-143(in Chinese).
[6] ZHANG J F,DU X P.Time-dependent reliability analysis for function generator mechanisms[J].Journal of Mechanical Design,2011,133(3):031005.
[7] ANDERIEU-RENAUD C,SUDERT B,LEMAIRE M,et al.The PHI2 method:A way to compute time-variant reliability[J].Reliability Engineering and System Safety,2004,84(1):74-86.
[8] MEJRI M,CAZUGEL M,COGNARD J Y,et al.A time-variant reliability approach for aging marine structures with nonlinear behavior[J].Computers & Structures,2011,89(19-20):1742-1753.
[9] LI J,CHEN J B,FAN W L.The equivalent extreme-value event and evaluation of the structural system reliability[J].Structure Safety,2007,29(2):112-131.
[10] 马小兵,任宏道,蔡义坤.高温结构可靠性分析的时变响应面法[J].北京航空航天大学学报,2015,41(2):198-202.MA X B,REN H D,CAI Y K.Time-varying response surface method for high-temperature structural reliability analysis[J].Journal of Beijing University of Aeronautics and Astronautics,2015,41(2):198-202(in Chinese).
[11] DU X P.Time-dependent mechanism reliability analysis with envelope function and first-order approximation[J].Journal of Mechanical Design,2014,136(8):081010.
[12] ZHANG J F, DU X P.Time-dependent reliability analysis for function generation mechanisms with random joint clearances[J].Mechanism and Machine Theory,2015,92:184-199.
[13] WEI P F,SONG J W,LU Z Z,et al.Time-dependent reliability sensitivity analysis of motion mechanisms[J].Reliability Engineering and System Safety,2016,149:107-120.
[14] WEI P F,WANG Y Y,TANG C H.Time-variant global reliability sensitivity analysis of structures with both input random variables and stochastic processes[J].Structural and Multidisciplinary Optimization,2017,55(5):1883-1898.
[15] 张明.结构可靠度分析-方法与程序[M].北京.科学出版社,2009:204-206.ZHANG M.Structural reliability analysis:Method and prosedures[M].Beijing:Science Press,2009:204-206(in Chinese).
[16] WANG Z L,HUANG H Z,LI Y F,et al.An approach to system reliability analysis wiyh fuzzy random variables[J].Mechanism and Machine Theory,2012,52:35-46.
[17] 张萌,陆山.模糊可靠性模型的收敛性及改进的截集分布[J].北京航空航天大学学报,2014,40(8):1109-1115.ZHANG M,LU S.Convergence of fuzzy reliability models and an improved cut-set distribution[J].Journal of Beijing University of Aeronautics and Astronautics,2014,40(8):1109-1115(in Chinese). |