Risk decision for the development of the aerospace project based on the incomplete linguistic information
Yang Yaqin1, Zhou Rongxi2, Qiu Wanhua1*
1. School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100191, China;
2. School of Economics and Management, Beijing University of Chemical Technology, Beijing 100029, China

ժҪ
�����
�������
Download: PDF (312KB)   HTML 1KB   Export: BibTeX or EndNote (RIS)      Supporting Info
ժҪ ��Ժ���������Ŀ���չ���ĸ�����,�����һ�ֻ����ִ����������Ծ��߷����ĺ���������Ŀ��������ģ��.�����˲���ȫ������Ϣ�»��ڲ�ȷ����չ�����Ȩƽ�����ӵľ��߷���.����Ŀ���ձ�Ƚ�������չ,һ����ʹ�÷��ն�������׼ȷ;��һ�����ܹ��ܺõ������ģ���е�������Ϣ����ƥ��.�Ժ���������Ŀ���վ���Ϊ��˵���˸÷�����ʵ���Ժ���Ч��,Ϊ��Ŀ���������ṩ��һ����˼·.
Service
�ѱ����Ƽ�������
�����ҵ����
�������ù�����
Email Alert
RSS
�����������
������
����ϲ
���һ�
�ؼ����� ���վ���   ����ȫ������Ϣ   ����������Ŀ   ��ȷ����չ�����Ȩƽ������     
Abstract�� For the complexity of aerospace project development, its risk evaluating model was proposed on the basis of modern multiple attribute linguistic decision method. The method of decision based on uncertain extended ordered weighed averaging (UEOWA) operator was given under incomplete linguistic information. The scale of risk measure was extended, on the one hand which can measure accurately the risk, on the other hand which can match with linguistic information of decision model in reason. The example of risk decision for aerospace project development was presented to show the feasibility and effectiveness of this method. It can offer a new method for the evaluation of project risk.
Keywords�� risk decision   incomplete linguistic information   aerospace project development   uncertain extended ordered weighed averaging(UEOWA) operator     
Received 2007-12-09;
Fund:

������Ȼ��ѧ����������Ŀ(70701003)

About author: ������(1965-),Ů,����������,������,yaqinyang514@sohu.com.
���ñ���:   
������, ����ϲ,���һ�.���ڲ���ȫ������Ϣ�ĺ���������Ŀ���վ���[J]  �������պ����ѧѧ��, 2008,V34(12): 1433-1436
Yang Yaqin, Zhou Rongxi,Qiu Wanhua.Risk decision for the development of the aerospace project based on the incomplete linguistic information[J]  JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND A, 2008,V34(12): 1433-1436