[1] |
Leach L P. Critical chain project management[M]. London: Artech House Professional Development Library, 2000.
|
[2] |
Styen H. Project management applications of the theory of the constraints beyond critical chain scheduling[J]. International Journal of Project Management, 2002, 20(1): 75-80.
|
[3] |
Herman S. An investigation into the fundamentals of critical chain project scheduling[J]. International Journal of Project Management, 2001, 19(6): 363-369.
|
[4] |
Leach L P. Critical chain project management improves project performance[J]. Project Management Journal, 1999, 30(2): 39-51.
|
[5] |
Francilco A R, Duran A. Critical clouds and critical sets in resource-constrained projects[J]. International Journal of Project Management, 2004, 22(6): 489-497.
|
[6] |
Styen H. An investigation into the fundamentals of critical chain project scheduling[J]. International Journal of Project Management, 2000, 19: 363-369.
|
[7] |
Chiu-Chi Wei, Ping-Hung Liu, Ying-Chin Tsai. Resource-constrained project management using enhanced theory of constraint[J]. International Journal of Project Management, 2002, 20: 561-567.
|
[8] |
Elmaghraby S E E, Herroelen W S, Leus R. Note on the paper ‘Resource-constrained project management using enhanced theory of constraint’ by Wei et al[J]. International Journal of Project Management, 2003, 21(4): 301-305.
|
[9] |
TOM ASˇU2 ASˇU2 UBRT, PAVL NA LANGROV. Aematical pogramming model of the citical chain method.1997.
|
[10] |
王雪青, 郭留洋, 符桃. 基于关键链技术的工程项目进度规划问题研究 . 河北工业大学学报, 2005, 34(6).
|
[11] |
刘士新,宋健海,唐加福. 资源受限项目调度中缓冲区的设定方法[J]. 系统工程学报, 2006(21).
|
[12] |
马国丰, 尤建新. 关键链项目群进度管理的定量分析[J]. 系统工程理论与实践, 2007, 27(9): 54-60.
|
[13] |
Herroelen W S, Leus R. On the merits and pitfalls of critical chain scheduling[J]. Journal of Operations Management, 2001, 19(5).
|
[14] |
Sood Shailesh. Theory of constraints can change the way you manage your projects[J]. Electronic Engineering Times, 2002 (1230): 40.
|
[15] |
莫巨华. 基于关键链的项目调度模型与算法 . 沈阳:东北大学信息科学与工程学院, 2005.
|
[16] |
万伟, 蔡晨, 王长峰. 在单资源约束项目中的关键链管理[J]. 中国管理科学, 2003, 11 (2): 70-75.
|
[17] |
马国丰, 尤建新, 杜学美. 识别关键冲突任务的定量分析[J]. 上海交通大学学报, 2006(4): 669-671,676.
|
[18] |
管在林, 马力, 何敏,等. 基于贡献度的项目调度方法研究[J]. 计算机集成制造系统, 2008, 14(12): 2431-2435.
|
[19] |
Patrick F S. Critical chain scheduling and buffer management: getting out from between Parkinson’s rock and Murphy’s hard place[J]. PM Network, 1999, 13(4):57-62.
|
[20] |
Rizzo T. Operational measurements for product development organizations[J]. PM Magazine,1999, 13(12): 31-35.
|
[21] |
Newblod R C. Project management in the fast lane-applying the theory of constraints[M]. Boca Raton: The St. Lucie Press, 1998:55-57.
|
[22] |
Herroelen W S, Leus R, Demeulemeester E L. Critical chain project scheduling——do not oversimplify[J]. Project Management Journal, 2002, 33(4): 46-60.
|
[23] |
Zinovy D, Radovililsky. A quantitative approach to estimate the size of the buffer in the theory of constraints[J]. International Journal of Production Economics, 1998, 55(2): 113-119.
|
[24] |
Hoel K, Taylor S G. Quantifying buffers for project schedules[J]. Production and Inventory Management Journal, 1999, 40(2): 43-47.
|
[25] |
Yongyi Shou, Yeo K T. Estimation of project buffers in critical chain project management[J]. Management of Innovation and Technology, 2000, 2: 162-167.
|
[26] |
Oya I Tukel, Walter O Rom, Sandra Duni Eksioglu. An investigation of buffer sizing techniques in critical chain scheduling[J]. European Journal of Operational Research, 2006, 172: 401-411.
|
[27] |
蒋国萍, 陈英武. 基于关键链的项目进度问题研究 //章祥荪,王建方,刘宝碇,等. 中国运筹学会第七届学术交流会论文集. 香港: Global-Link出版社, 2004: 719-724.
|
[28] |
张静文, 胡信布, 王茉琴. 关键链项目计划调度方法研究[J]. 科技管理研究, 2008, 3: 280-283.
|
[29] |
赵之友. 关键链项目计划制定中的工期裕量问题研究[J]. 电子科技大学学报:社科版, 2008, 10(6): 22-27.
|
[30] |
Zhang Min, Chen Rongqiu. Buffer sized technique in critical chain management: a fuzzy approach //4th International Conference on Wireless Communications. Dalian: Inst. of Elec. and Elec. Eng. Computer Society, 2008: 1-4.
|
[31] |
Graham K Rand. Critical chain: the theory of constraints applied to project management[J]. International Journal of Project Management, 2000, 18(5): 513-516.
|
[32] |
Charlene Spoede Budd, Marjorie J Cooper. Improving on-time service delivery: the case of project as product[J]. Human Systems Management, 2005(24): 67-81.
|
[33] |
李宁, 吴之明. 网络计划技术的新发展——项目关键链管理(CCPM)[J]. 公路, 2002, 10:83-86.
|
[34] |
刘士新, 宋健海, 唐加福. 关键链——一种项目计划与调度新方法[J]. 控制与决策, 2003, 18(5): 513-516.
|
[35] |
蔡晨, 万伟. 基于PERT/CPM的关键链管理[J]. 中国管理科学, 2003, 11(6): 35-39.
|
[36] |
马国丰, 屠梅曾, 史占中. 基于TOC的项目管理技术模型研究[J]. 系统工程理论方法应用, 2005, 14(1): 84-87.
|
[37] |
邓斌, 基于关键链技术的项目进度管理体系[J]. 财贸研究, 2008, 1: 155-156.
|
[38] |
Willy Herroelen. Project scheduling-theory and practice[J]. Production and Operations Management, 2005, 14(4): 413-432.
|
[39] |
赵道致, 廖华. 对关键链法认识的几个误区[J]. 工业工程, 2005, 8(2): 4-6.
|
[40] |
陈伟珂, 韩志国. 关键链项目管理(CCPM)方法应用边界条件研究[J]. 水利水电技术, 2007, 9(38): 71-74.
|
[41] |
Yeo K T, Ning J H. Integrating supply chain and critical chain concepts in engineer-produce-construct (EPC) projects[J]. International Journal of Project Management, 2002, 20: 253-262.
|
[42] |
Sonawane R. Applying system dynamics and critical chain methods to develop a modern construction project management system . United States-Texas: Texas A&M University- Kingsville, 2005.
|
[43] |
Stijnvande Vonder, Erik Demeulmeester, Willy Herroelen, et al. The use of buffers in project management: the trade-off between stability and makespan . International Journal of Production Economics, 2005, 97(2): 227-240.
|
[44] |
Thomas G Lechler, Edward A Stohr, Boaz Ronen. Critical chain: a new project management paradigm or old wine in new bottles[J]. Engineering Management Journal, 2005, 17(4): 45-58.
|
[45] |
杨雪松, 胡旻. 基于关键链法的多项目管理[J]. 工业工程与管理, 2005, 2: 48-52.
|