Application of TOC in Project Risk Management
-
摘要: 通过TOC在项目资源安排中成功应用的启示以及对项目风险管 理传统模式的分析,将TOC理念引入到项目风险管理中,得出一个动态的循环的风险管理模 式。Abstract: This paper, on the basis of the suggestion from successful application of TOC in project resources allocation and the analysis of traditional models o f project risk management, introduces the idea of TOC into project risk manageme nt, and works out a dynamic and circulative risk management model.
-
Keywords:
- TOC (theory of constraints) /
- project risk management /
- model
-
-
[1] 傅诒辉,戴建设,李大伟.基于约束理论的一个管理决策的NLP模型[J]. 系统工程学报,1995,10(2):84-85. [2] 邱菀华,杨爱华.项目管理导论[M].北京:机械工业出版社,2002.1. [3] Steyn H. Project Management Applications of the Theory of Constraints bey ond Critical Chain Scheduling[J].International Journal of Project Management, 2002,(20). [4] 陈启申.约束理论[J].计算机集成制造理论,1998,(5). [5] 邱菀华,杨爱华.项目管理学[M].北京:科学出版社,2000.153.