ISSN 1008-2204
CN 11-3979/C
Tang Pengxiang, Ma Bingtao. Inter-Collegiate Horizontal Project Management Process Optimization Based on Process Management[J]. Journal of Beijing University of Aeronautics and Astronautics Social Sciences Edition, 2011, 24(2): 117-120.
Citation: Tang Pengxiang, Ma Bingtao. Inter-Collegiate Horizontal Project Management Process Optimization Based on Process Management[J]. Journal of Beijing University of Aeronautics and Astronautics Social Sciences Edition, 2011, 24(2): 117-120.

Inter-Collegiate Horizontal Project Management Process Optimization Based on Process Management

More Information
  • Received Date: April 22, 2010
  • Published Date: March 24, 2011
  • Process management ensures the optimal outcome by optimal process, through process control and continuous improvement. The process concept and methods will be introduced to the management of inter-collegiate horizontal research projects. The paper argues that the current flow has some defects, lacks effective monitoring of the project implementation process, and is weak on protecting project results and so on, and then suggests ways to optimize the design of the existing processes, proposes specific measures and optimization analysis.
  • [1] 谭晓宁. 论基于课题制的高校科研项目管理[J]. 科研管理,2004(1): 37-39.
    [2] 商悦,段德宏. 高校科研管理引入ISO9000族标准必要性和可行性分析[J]. 科技成果纵横,2008(5):29-31.
    [3] 汤鹏翔. 高校科研项目组织形式创新研究[J]. 北京航空航天大学学报:社会科学版,2008(1):78-80.

Catalog

    Article views (1395) PDF downloads (734) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return