Citation: | ZHANG Shuai, LI Junliang, LYU Weimin, et al. Optimization of carrier-based aircraft repairable spares inventory systems under limited maintenance ability[J]. Journal of Beijing University of Aeronautics and Astronautics, 2015, 41(6): 1034-1041. doi: 10.13700/j.bh.1001-5965.2014.0393(in Chinese) |
[1] |
何亚群, 谭学峰, 金福禄.基于可用度的飞机可修件需求分析[J].系统工程与电子技术, 2004, 26(6):848-849. He Y Q, Tan X F, Jin F L.Demand analysis of aircraft repairable spares based on availability[J].Systems Engineering and Electronics, 2004, 26(6):848-849(in Chinese).
|
[2] |
罗祎, 阮旻智, 袁志勇.多级维修供应下可修复备件库存建模与优化[J].系统工程理论与实践, 2013, 33(10):2623-2630. Luo Y, Ruan M Z, Yuan Z Y.Modeling and optimization of repairable spare parts under the multi-echelon maintenance supply[J].Systems Engineering-Theory & Practice, 2013, 33(10):2623-2630(in Chinese).
|
[3] |
Sherbrooke C C.Optimal inventory modeling of systems multi-echelon techniques[M].2nd ed.Boston:Kluwer Academic Publishers, 2004:4-6, 25-32, 111-112.
|
[4] |
刘喜春, 王磊, 许永平, 等.战时可修复备件供应保障优化模型[J].系统工程与电子技术, 2010, 32(12):2595-2598. Liu X C, Wang L, Xu Y P, et al.Research on ABMS based wartime spares support adaptation decision[J].Systems Engineering and Electronics, 2010, 32(12):2595-2598(in Chinese).
|
[5] |
Sherbrooke C C.METRIC:A multi-echelon technique for recoverable item control[J].Operational Research, 1968, 16(1):122-141.
|
[6] |
Slay F M.Vari-Metric:An approach to modeling multi-echelon resupply when the demand process is Poisson with a gamma prior, Report AF301-3[R].Santa Monica, CA:RAND, 1984.
|
[7] |
Sherbrooke C C.Vari-Metric:Improved approach approximations for multi-indenture, multi-echelon availability models[J].Operations Research, 1986, 34(2):311-319.
|
[8] |
Gross D.On the ample service assumptions of Palm's theorem in inventory modeling[J].Management Science, 1982, 28(9):1065-1079.
|
[9] |
Kim J S, Shin K C, Yu H K.Optimal algorithm to determine the spare inventory level for a repairable-item inventory system[J].Computers & Operations Research, 1996, 23(3):289-297.
|
[10] |
Kim J S, Shin K C, Park S K.An optimal algorithm of repairable-item inventory systems with depot spares[J].Journal of the Operational Research Society, 2000, 51(3):350-357.
|
[11] |
Díaz A, Fu M C.Models for multi-echelon repairable item inventory systems with limited repair capacity[J].European Journal of Operational Research, 1997, 97(3):480-492.
|
[12] |
Rappold J A, Van Roo B D.Designing multi-echelon service parts networks with finite repair capacity[J].European Journal of Operational Research, 2009, 199(3):781-792.
|
[13] |
Bijvank M, Koole G, Vis I F A.Optimising a general repair kit problem with a service constraint[J].European Journal of Operational Research, 2010, 204(1):76-85.
|
[14] |
Ruiz-Castro J E, Li Q L.Algorithm for a general discrete k-out-of-n:G system subject to several type of failure with an indefinite number of repairpersons[J].European Journal of Operational Research, 2011, 211(1):97-111.
|
[15] |
Sleptchenko A, Van der Heijden M C, Van Harten A.Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems[J].International Journal of Production Economics, 2002, 79(3):209-230.
|
[16] |
阮旻智, 李庆民, 黄傲林, 等.有限维修渠道约束下多级维修供应系统库存控制[J].航空学报, 2012, 33(11):2018-2027. Ruan M Z, Li Q M, Huang A L, et al.Inventory control of multi-echelon maintenance supply system under limited repair channel constraint[J].Acta Aeronautica et Astronautica Sinica, 2012, 33(11):2018-2027(in Chinese).
|
[17] |
夏国清, 陈红召.面向使用可用度的舰载机可修备件库存模型[J].哈尔滨工程大学学报, 2013, 34(1):98-103. Xia G Q, Chen H Z.Operational availability oriented inventory model for repairable spare parts of embarked air-wings[J].Journal of Harbin Engineering University, 2013, 34(1):98-103(in Chinese).
|