Citation: | ZHAO Limin. Production plan and integrated dispatch optimization of aircraft digital assembly[J]. Journal of Beijing University of Aeronautics and Astronautics, 2016, 42(10): 2139-2145. doi: 10.13700/j.bh.1001-5965.2015.0632(in Chinese) |
[1] |
MARAVELIAS C T,SUNG C.Integration of production planning and scheduling:Overview,challenges and opportunities[J].Computers & Chemical Engineering,2009,33(12):1919-1930.
|
[2] |
HENRIQUES E.Towards the integration of process and production planning:An optimization model for cutting parameters[J].International Journal of Advanced Manufacturing Technology,2006,28(1-2):117-128.
|
[3] |
SUNG C,MARAVELIAS C T.An attainable region approach for production planning of multi-product processes[J].AIChE Journal,2007,53(5):1298-1315.
|
[4] |
ERDIRIK-DOGAN M,GROSSMANN I E.Planning models for parallel batch reactors with sequence-dependent changeovers[J].AIChE Journal,2007,53(9):2284-2300.
|
[5] |
WAN X,PEKNY J F,REKLAITIS G V.Simulation-based optimization with surrogate models-Application to supply chain management[J].Computers & Chemical Engineering,2006,29(6):1317-1328.
|
[6] |
ERDIRIK-DOGAN M,GROSSMANN I E.A decomposition method for the simultaneous planning and scheduling of single-stage continuous multiproduct plants[J].Industrial and Engineering Chemistry Research,2007,45(1):1-42.
|
[7] |
WU D,IERAPETRITOU M.Hierarchical approach for production planning and scheduling under uncertainty[J].Chemical Engineering and Processing:Process Intensification,2007,46(11):1129-1140.
|
[8] |
YAN H S,ZHANG X D.A case study on integrated production planning and scheduling in a three-stage manufacturing system[J].IEEE Transactions on Automation Science and Engineering,2007,4(1):86-92.
|
[9] |
路致远,严洪森,沈境.基于HGA的冲压车间生产计划与调度的集成优化[J].计算机技术与发展,2007,17(3):179-182.LU Z Y,YAN H S,SHEN J.Integrated optimization of production planning and scheduling based on hybrid genetic algorithm[J].Computer Technology and Development,2007,17(3):179-182(in Chinese).
|
[10] |
尚文利,范玉顺.成批生产计划调度的集成建模与优化[J].计算机集成制造系统,2005,11(12):1663-1667.SHANG W L,FAN Y S.Integrated optimization modeling of production planning and scheduling for batch production[J].Computer Integrated Manufacturing Systems,2005,11(12):1663-1667(in Chinese).
|
[11] |
陈琳,严洪森,刘通,等.汽车装配线生产计划与调度的集成优化方法[J].计算机技术与发展,2009,19(1):134-138.CHEN L,YAN H S,LIU T,et al.Approaches to integrated optimization of production planning and scheduling on automobile assembly lines[J].Computer Technology and Development,2009,19(1):134-138(in Chinese).
|
[12] |
BOWERS M R,JARVIS J P.A hierarchical production planning and scheduling model[J].Decision Sciences,1992,23(1):144-159.
|
[13] |
QIU M M,FREDENDALL L D,ZHU Z.Application of hierarchical production planning in a multiproduct multi machine environment[J].International Journal of Production Research,2001,39(13):2803-2816.
|
[14] |
KARIMI B,FATEMI G.The capacitated lot sizing problem:A review of model algorithms[J].The International Journal of Management Science,2003,31(5):365-378.
|
[15] |
张晓东,严洪森.一类Job-Shop车间生产计划与调度的集成优化[J].控制与决策,2003,18(5):581-584.ZHANG X D,YAN H S.Integrated optimization of production planning and scheduling for a kind of job shop[J].Control and Decision,2003,18(5):581-584(in Chinese).
|
[16] |
LASSERRE J B.An integrated model for job-shop planning and scheduling[J].Management Science,1992,38(8):1201-1211.
|
[17] |
严洪森,夏琦峰,朱敏如,等.汽车装配车间生产计划与调度的同时优化方法[J].自动化学报,2002,28(6):911-919.YAN H S,XIA Q F,ZHU M R,et al.Approaches to simultaneous production planning and scheduling in automobile assembly workshops[J].Acta Automatica Sinica,2002,28(6):911-919(in Chinese).
|
[18] |
张晓东,严洪森.多级车间生产计划和调度的集成优化[J].机械工程学报,2005,41(9):98-105.ZHANG X D,YAN H S.Production planning and scheduling of multi-stage workshop[J].Chinese Journal of Mechanical Engineering,2005,41(9):98-105(in Chinese).
|
[19] |
陈志祥.学习曲线及在工业生产运作研究中的应用综述[J].中国工程科学,2007,9(7):82-88.CHEN Z X.Learning curve and its application in production operational research[J].Engineering Science,2007,9(7):82-88(in Chinese).
|