Citation: | CAI Zhiming, JIN Jiashan, CHEN Yanqiaoet al. Optimization method of multi-echelon system equipment configuration under unsteady state and multi-constraint[J]. Journal of Beijing University of Aeronautics and Astronautics, 2017, 43(1): 36-46. doi: 10.13700/j.bh.1001-5965.2016.0004(in Chinese) |
Some related questions in system equipment configuration under unsteady state and multi-constraint are discussed. First, taking the very low utilization rate of escort equipment in the waters off Somalia as study background, the paper presents the solution to base and central warehouse spare parts demand rate. Second, the factors of three constraints are calculated by using the edge effect method and Lagrange multiplier method. Then, four projects of multi-echelon system equipment configuration are built according to whether considering the cannibalization or lateral transshipment policy. Finally, the results of four projects are comparatively analyzed, and numerical projects show that an indicative reference can be provided for decision-makers to make up warship formation equipment configuration projects in peace and war time.
[1] |
SHERBROOKE C C.METRIC:A multi-echelon technique for recoverable item control[J].Operations Research,1968,16(1):122-141. doi: 10.1287/opre.16.1.122
|
[2] |
SHERBROOKE C C.Optimal inventory modeling of systems:Multi-echelon techniques[M].Amsterdam:Springer Science & Business Media,2006.
|
[3] |
LEVNER E,PERLMAN Y,CHENG T C E,et al.A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand[J].International Journal of Production Economics,2011,132(1):43-51. doi: 10.1016/j.ijpe.2011.03.004
|
[4] |
SAMOUEI P,KHEIRKHAH A S,FATTAHI P.A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount[J].Annals of Operations Research,2015,226(1):551-563. doi: 10.1007/s10479-014-1718-z
|
[5] |
COSTANTINO F,DI GRAVIO G,TRONCI M.Multi-echelon,multi-indenture spare parts inventory control subject to system availability and budget constraints[J].Reliability Engineering & System Safety,2013,119:95-101.
|
[6] |
TOPAN E,BAYINDIR Z P.Multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse under compound Poisson demand[J].Journal of the Operational Research Society,2012,63(8):1143-1152. doi: 10.1057/jors.2011.125
|
[7] |
WONG H,VAN HOUTUM G J,CATTRYSSE D,et al.Multi-item spare parts systems with lateral transshipments and waiting time constraints[J].European Journal of Operational Research,2006,171(3):1071-1093. doi: 10.1016/j.ejor.2005.01.018
|
[8] |
WONG H,KRANENBURG B,VAN HOUTUM G J,et al.Efficient heuristics for two-echelon spare parts inventory systems with an aggregate mean waiting time constraint per local warehouse[J].OR Spectrum,2007,29(4):699-722. doi: 10.1007/s00291-007-0077-4
|
[9] |
WONG H,VAN HOUTUM G J,CATTRYSSE D,et al.Simple,efficient heuristics for multi-item multi-location spare parts systems with lateral transshipments and waiting time constraints[J].Journal of the Operational Research Society,2005,56(12):1419-1430. doi: 10.1057/palgrave.jors.2601952
|
[10] |
TOPAN E,BAYINDIR Z P,TAN T.An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse[J].Operations Research Letters,2010,38(5):454-461. doi: 10.1016/j.orl.2010.05.006
|
[11] |
WONG H,CATTRYSSE D,VAN OUDHEUSDEN D.Inventory pooling of repairable spare parts with non-zero lateral transshipment time and delayed lateral transshipments[J].European Journal of Operational Research,2005,165(1):207-218. doi: 10.1016/j.ejor.2003.09.031
|
[12] |
TIACCI L,SAETTA S.Reducing the mean supply delay of spare parts using lateral transshipments policies[J].International Journal of Production Economics,2011,133(1):182-191. doi: 10.1016/j.ijpe.2010.03.020
|
[13] |
PATERSON C,KIESMVLLER G,TEUNTER R,et al.Inventory models with lateral transshipments:A review[J].European Journal of Operational Research,2011,210(2):125-136. doi: 10.1016/j.ejor.2010.05.048
|
[14] |
FISHER W W.Markov process modelling of a maintenance system with spares,repair,cannibalization and manpower constraints[J].Mathematical and Computer Modelling,1990,13(7):119-125. doi: 10.1016/0895-7177(90)90134-9
|
[15] |
EYNAN A.The multi-location inventory centralization problem with first-come,first-served allocation[J].European Journal of Operational Research,1999,114(1):38-49. doi: 10.1016/S0377-2217(98)00036-8
|
[16] |
蔡芝明,金家善,李广波.多约束下随船备件配置优化方法[J].系统工程理论与实践,2015,35(6):1561-1566. http://www.cnki.com.cn/Article/CJFDTOTAL-XTLL201506021.htm
CAI Z M,JIN J S,LI G B.Warship spare parts allotment optimization method under multi-constraints[J].Systems Engineering-Theory & Practice,2015,35(6):1561-1566(in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-XTLL201506021.htm
|
[17] |
刘任洋,李庆民,李华.基于横向转运策略的可修件三级库存优化模型[J].航空学报,2014,35(12):3341-3349. http://www.cnki.com.cn/Article/CJFDTOTAL-HKXB201412017.htm
LIU R Y,LI Q M,LI H.Optimal model of three-echelon inventory for repairable spare parts with lateral transshipments strategy[J].Acta Aeronautica et Astronatica Sinica,2014,35(12):3341-3349(in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-HKXB201412017.htm
|
[18] |
LI Y Y.The big data:Check the smart ship time[EB/OL].Beijing:Economic Daily News,2014(2014-10-20)[2016-01-04].http://www.ce.cn/xwzx/gnsz/gdxw/201410/20/t20141020_3730494.shtml.
|