Volume 48 Issue 12
Dec.  2022
Turn off MathJax
Article Contents
ZHANG Shengyu, ZHU Zhencai, HU Haiyinget al. Burst tasks scheduling method for infrared LEO constellation based on multi-strategies[J]. Journal of Beijing University of Aeronautics and Astronautics, 2022, 48(12): 2405-2414. doi: 10.13700/j.bh.1001-5965.2021.0119(in Chinese)
Citation: ZHANG Shengyu, ZHU Zhencai, HU Haiyinget al. Burst tasks scheduling method for infrared LEO constellation based on multi-strategies[J]. Journal of Beijing University of Aeronautics and Astronautics, 2022, 48(12): 2405-2414. doi: 10.13700/j.bh.1001-5965.2021.0119(in Chinese)

Burst tasks scheduling method for infrared LEO constellation based on multi-strategies

doi: 10.13700/j.bh.1001-5965.2021.0119
More Information
  • Corresponding author: ZHANG Shengyu, E-mail: zhangsy@microsate.com
  • Received Date: 16 Mar 2021
  • Accepted Date: 05 May 2021
  • Publish Date: 11 Jun 2021
  • Aiming at problems of the burst task planning and resource scheduling of the infrared LEO constellation, a method based on multi-strategies is proposed considering the temporal and spatial distribution characteristics of infrared LEO constellation. And drawing on the design characteristics of infrared LEO constellation such as the uniformity of the global distribution, the symmetry of the structure and the periodic motion, this multi-strategies involve a long-term on-duty grouping strategy based on geographic divisions and the event triggering strategy based on relative motion analysis. Under the guidance of these strategies, this paper completes task grouping and carries out work window scheduling. Through simulation analysis, the multi-strategies reveal the effectivity, while dealing with target triggers in different areas and fulfilling of grouping and working window scheduling in real time, which insure the timeline of system response under task emergencies. Due to the priority grouping strategy, global complexity is reduced, and the method is proved to be innovative with practical application values.

     

  • loading
  • [1]
    GUO C, XIONG W, LIU C X. Research on emergency mission planning of earth observation satellites[C]//Proceedings of the 1st IEEE International Conference on Computer Communication and the Internet. Piscataway: IEEE Press, 2016: 210-214.
    [2]
    HU J, HUANG H, YANG L, et al. A multi-objective optimization framework of constellation design for emergency observation[J]. Advances in Space Research, 2021, 67: 531-545. doi: 10.1016/j.asr.2020.09.031
    [3]
    陈书剑, 李智, 胡敏, 等. 应急任务响应时间最优的多星成像规划方法[J]. 中国空间科学技术, 2020, 40(2): 17-28. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGKJ202002004.htm

    CHEN S J, LI Z, HU M, et al. Multi-satellite imaging planning method with optimal response time for emergency tasks[J]. Chinese Space Science and Technology, 2020, 40(2): 17-28(in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGKJ202002004.htm
    [4]
    贺仁杰, 高鹏, 白保存, 等. 成像卫星任务规划模型、算法及其应用[J]. 系统工程理论与实践, 2011, 31(3): 411-422. https://www.cnki.com.cn/Article/CJFDTOTAL-XTLL201103005.htm

    HE R J, GAO P, BAI B C, et al. Models, algorithms and applications to the mission planning system of imaging satellites[J]. System Engineering Theory and Practice, 2011, 31(3): 411-422(in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-XTLL201103005.htm
    [5]
    HAN P, HE Z W, GENG Y Z, et al. Mission planning for agile earth observing satellite based on genetic algorithm[C]//Proceedings of the 38th Chinese Control Conference. Piscataway: IEEE Press, 2019: 564-569.
    [6]
    张晟宇, 孙煜坤, 朱振才, 等. 启发式前后向链条优化组合在轨多目标观测规划算法[J]. 系统工程与电子技术, 2021, 43(5): 1262-1269. https://www.cnki.com.cn/Article/CJFDTOTAL-XTYD202105014.htm

    ZHANG S Y, SUN Y K, ZHU Z C, et al. Heuristic optimized forward-backward chains combination method for on-board multi-targets observation planning[J]. Systems Engineering and Electronics, 2021, 43(5): 1262-1269(in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-XTYD202105014.htm
    [7]
    HE L, LIU X L, LAPORTE G, et al. An improved adaptive large neighborhood search algorithm for multiple agile satellites scheduling[J]. Computers & Operations Research, 2018, 100: 12-25.
    [8]
    姜维, 庞秀丽, 郝会成. 成像卫星协同任务规划模型与算法[J]. 系统工程与电子技术, 2013, 35(10): 2093-2101. doi: 10.3969/j.issn.1001-506X.2013.10.13

    JIANG W, PANG X L, HAO H C. Collaborative scheduling model and algorithm for imaging satellite network[J]. Systems Engineering and Electronics, 2013, 35(10): 2093-2101(in Chinese). doi: 10.3969/j.issn.1001-506X.2013.10.13
    [9]
    陈金勇, 张超, 李艳斌. 基于超启发式的多星协同任务规划算法研究[J]. 中国电子科学研究院学报, 2018, 13(3): 254-259. doi: 10.3969/j.issn.1673-5692.2018.03.004

    CHEN J Y, ZHANG C, LI Y B. Multi-star cooperative task planning based on hyper-heuristic algorithm[J]. Journal of China Academy of Electronics and Information Technology, 2018, 13(3): 254-259(in Chinese). doi: 10.3969/j.issn.1673-5692.2018.03.004
    [10]
    YAO F, LI J T, CHEN Y N, et al. Task allocation strategies for cooperative task planning of multi-autonomous satellite constellation[J]. Advances in Space Research, 2019, 63: 1073-1084. doi: 10.1016/j.asr.2018.10.002
    [11]
    YU Y, HOU Q, ZHANG J, et al. Mission scheduling optimization of multi-optical satellites for multi-aerial targets staring surveillance[J]. Journal of the Franklin Institute, 2020, 357: 8657-8677. doi: 10.1016/j.jfranklin.2020.06.023
    [12]
    孙立远, 熊伟. 基于补偿跟踪的低轨预警资源调度方法研究[J]. 装备学院学报, 2015, 26(3): 74-80. https://www.cnki.com.cn/Article/CJFDTOTAL-XYZH201503021.htm

    SUN L Y, XIONG W. Scheduling method of LEO early warning resources based on tracking compensation[J]. Journal of Equipment Academy, 2015, 26(3): 74-80(in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-XYZH201503021.htm
    [13]
    刘闻, 王晓路, 汪宏昇, 等. 基于Agent的低轨预警卫星星座探测仿真分析[J]. 系统仿真学报, 2019, 31(11): 2413-2421. https://www.cnki.com.cn/Article/CJFDTOTAL-XTFZ201911028.htm

    LIU W, WANG X L, WANG H S, et al. Agent based modeling and simulation analysis of LEO early-warning satellites[J]. Journal of System Simulation, 2019, 31(11): 2413-2421(in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-XTFZ201911028.htm
    [14]
    BUDIANTO I A, OLDS J R. A collaborative optimization approach to design and deployment of a space based infrared system constellation[C] // Conference. Piscataway: IEEE Press, 2000: 879415.
    [15]
    SHTARK T, GURFIL P. Low earth orbit satellite constellation for regional positioning with prolonged coverage durations[J]. Advances in Space Research, 2019, 63: 2469-2494.
    [16]
    任俊亮, 邢清华, 李龙跃. 局部空域覆盖的回归轨道预警星座设计方法[J]. 现代防御技术, 2016, 44(3): 1-6. https://www.cnki.com.cn/Article/CJFDTOTAL-XDFJ201603001.htm

    REN J L, XING Q H, LI L Y. Method on designing a part airspace covered early warning constellation in recursive orbit[J]. Morden Defence Technology, 2016, 44(3): 1-6(in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-XDFJ201603001.htm
    [17]
    田野, 李海岩, 秦国政, 等. 中低轨预警卫星覆盖效能与定位精度分析[J]. 兵工自动化, 2019, 38(7): 43-51. https://www.cnki.com.cn/Article/CJFDTOTAL-BGZD201907012.htm

    TIAN Y, LI H Y, QIN G Z, et al. Analysis of MEO and LEO early warning satellites: Coverage capability and positioning accuracy[J]. Ordnance Industry Automation, 2019, 38(7): 43-51(in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-BGZD201907012.htm
    [18]
    CHEN Y, ZHAO L F, LIU H J, et al. Analysis of configuration and maintenance strategy of LEO walker constellation[J]. Journal of Astronautics, 2019, 40(11): 1296-1303.
    [19]
    ROSSI A, PETIT A, MCKNIGHT D. Short-term space safety analysis of LEO constellations and clusters[J]. Acta Astronautica, 2020, 175: 476-483.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(12)  / Tables(4)

    Article Metrics

    Article views(214) PDF downloads(27) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return