WANG Zhongyan, WANG Zheng, QIU Likuan, et al. Agile and Low-Complexity Task Scheduling Algorithm for Aerial Unmanned Swarms Based on HGNN-PPO[J]. Journal of Beijing University of Aeronautics and Astronautics. doi: 10.13700/j.bh.1001-5965.2026.0123(in Chinese)
| Citation:
|
WANG Zhongyan, WANG Zheng, QIU Likuan, et al. Agile and Low-Complexity Task Scheduling Algorithm for Aerial Unmanned Swarms Based on HGNN-PPO[J]. Journal of Beijing University of Aeronautics and Astronautics. doi: 10.13700/j.bh.1001-5965.2026.0123(in Chinese)
|
WANG Zhongyan, WANG Zheng, QIU Likuan, et al. Agile and Low-Complexity Task Scheduling Algorithm for Aerial Unmanned Swarms Based on HGNN-PPO[J]. Journal of Beijing University of Aeronautics and Astronautics. doi: 10.13700/j.bh.1001-5965.2026.0123(in Chinese)
| Citation:
|
WANG Zhongyan, WANG Zheng, QIU Likuan, et al. Agile and Low-Complexity Task Scheduling Algorithm for Aerial Unmanned Swarms Based on HGNN-PPO[J]. Journal of Beijing University of Aeronautics and Astronautics. doi: 10.13700/j.bh.1001-5965.2026.0123(in Chinese)
|
Agile and Low-Complexity Task Scheduling Algorithm for Aerial Unmanned Swarms Based on HGNN-PPO
- Available Online:
24 Apr 2026