Volume 37 Issue 10
Oct.  2011
Turn off MathJax
Article Contents
Liu Rui, Ma Lin, Kang Rui, et al. Analysis method for influential factors of aviation equipment availability based prognostics and health management[J]. Journal of Beijing University of Aeronautics and Astronautics, 2011, 37(10): 1238-1244. doi: CNKI:11-2625/V.20111020.1126.003(in Chinese)
Citation: Liu Rui, Ma Lin, Kang Rui, et al. Analysis method for influential factors of aviation equipment availability based prognostics and health management[J]. Journal of Beijing University of Aeronautics and Astronautics, 2011, 37(10): 1238-1244. doi: CNKI:11-2625/V.20111020.1126.003(in Chinese)

Analysis method for influential factors of aviation equipment availability based prognostics and health management

doi: CNKI:11-2625/V.20111020.1126.003
  • Received Date: 18 Jun 2010
  • Publish Date: 30 Oct 2011
  • The aviation equipment availability analysis method was reviewed and the influential factors of aviation equipment availability were classified as three categories.The newly increased influential factors of aviation equipment availability were analyzed through analyzing in the influence of prognostics and health management (PHM) technology to the availability. These factors were specified in term of the sources as two categories: the operate factors and the design factors. Four reasonable assumptions to simplify the simulation process. were provided. Furthermore, the design factors were divided into five categories. Combined with an example, the definitions of the simulation inputs of aviation equipment availability were given with the values of them. And the output of the simulation process is the steady-state availability under given conditions. Simultaneously, the analytical algorithm of it is pressed. Then the compositions simulation program and its flow chart were detailed described. The simulation results of the example were given by graph. At the same time the processes and conclusions of univariate analysis and multi-coupling analysis were given to verify the feasibility of the analysis mentioned.

     

  • loading
  • [1] 杨为民.可靠性维修性保障性总论[M].北京:国防工业出版社,1995:20-22 Yang Weimin.Reliability,maintainability and supporability [M].Beijing: National Defense Industry Press,1995:20-22 (in Chinese) [2] Benjamin S Blanchard,Wolter K Fabrycky.System engineering and analysis[M].Beijing: Tsinghua University Press,2002:359-360 [3] Alexander H Levis,Paul K Houpt,Stamatios K Andreadakis.Effectiveness analysis of automotive systems //1985 American Control Conference.Boston: American Automatic Control Council,1985:1432-1437 [4] 高尚,娄寿春.武器系统效能评定方法综述[J].系统工程理论与实践,1998(7):109-114 Gao Shang,Lou Shouchun.Progress in sssessing the effectiveness of weapon system[J].Systems Engineering-Theory & Ppactice,1998(7):109-144 (in Chinese) [5] 谈斌,周海云,张己化.基于HLA的装备作战效能评估仿真框架研究[J].计算机仿真,2008,25(5):11-14 Tan Bin,Zhou Haiyun,Zhang Jihua.A weapon equipment simulation framework for efficiency evaluation based on HLA[J].Computer Simulation,2008,25(5):11-14 (in Chinese) [6] 王正元,刘靖旭,谭跃进,等.基于作战仿真的装甲车辆作战效能评估方法[J].国防科学技术大学学报,2004,26(2):106-109 Wang Zhengyuan,Liu Jingxu,Tan Yuejin,et al.Combat effectiveness evaluation of the armored vehicle based on combat simulation[J].Journal of National University of Defense Technology,2004,26(2):106-109 (in Chinese) [7] Fashandi A.System availability and operation support modeling //The 28th International Electronics Manufacturing Technology Symposium.California:IEEE Press,2003:347-350 [8] 汪民乐,高晓光,蔡付东.作战飞机效能分析研究综述[J].飞行力学,2001,19(4):1-5 Wang Minle,Gao Xiaoguang,Cai Fudong.Overview of research on military aircraft combat effectiveness analysis[J].Flight Dynamics,2001,19(4): 1-5 (in Chinese) [9] 贾跃,宋保维,梁庆卫.鱼雷武器系统效能评估模型及其仿真[J].兵工学报,2006,27(3):475-479 Jia Yue,Song Baowei,Liangqingwei.Mathematical model and simulation of torpedo weapon system effectiveness evaluation[J].Acta Armamentarii,2006,27(3):475-479 (in Chinese) [10] 于小红,蔡远文,杨仁保.运载火箭发射过程效能评估方法[J].导弹与航天运载技术,2005(3):19-22 Yu Xiaohong,Cai Yuanwen,Yang Renbao.Research on effectiveness evaluation for launch process[J].Missiles and Space Vehicles,2005(3):19-22 (in Chinese) [11] Kirmani E,Hood C S.A new approach to analysis of interval availability //The 3rd International Conference on Availability,Reliability and Security.California: IEEE Computer Society,2008:479-483 [12] 王立超.系统可用度匹配分析与设计.南京:南京理工大学自动化学院,2008 Wang Lichao.The analysis and design of the matchinglization for system availability.Nanjing: School of Automatic,Nanjing University of Science & Technology,2008 (in Chinese) [13] Zheng Z H,Cui L R,Hawkes A G.A study on a single-unit Marko repairable system with repair time omission[J].IEEE Transaction on Reliability,2006,55(5):182-188 [14] 赵冰化,王勇.军用飞机可用度概率模型及仿真[J].火力与指挥控制,2007,32(6):80-83 Zhao Binghua,Wang Yong.A research on conceptual model and simulation for the military aircraft availability[J].Fire Control and Command Control,2007,32(6):80-83 (in Chinese) [15] 高文,祝明发,徐志伟.基于维修时间约束的机群系统可用度的仿真算法[J].计算机学报,2001,24(8):876-880 Gao Wen,Zhu Mingfa,Xu Zhiwei.A simulation algorithm of cluster system s availability within repair time constrains[J].Chinese Journal of Computers,2001,24(8): 876-880 (in Chinese) [16] Nicola V F,Shahabuddin P,Heidelberger P,et al,Fast simulation of steady-state availability in non-Markovian highly dependable systems //The 23rd International Symposium on Fault-Tolerant Computing.France: IEEE Computer Society,1993:38-47 [17] Nebel S,Bertsche B.Modeling and simulation methodology of the operational availability and logistics using extended colored stochastic petri nets:an astronautics case study //2008 Reliability and Maintainability Symposium.Nevada:IEEE Press,2008:434-439 [18] Bazargan M,McGrath R N.Discrete event simulation to improve aircraft availability and maintainability //2003 Reliability and Maintainability Symposium.Florida: IEEE,2003:63-67 [19] 冯旭中,张振友.基于任务的复杂武器系统可用性仿真研究[J].兵工自动化,2009,28(2):71-73 Feng Xuzhong,Zhang Zhenyou.Availability simulation on complex weapon systems based on mission[J].Ordnance Industry Automation,2009,28(2):71-73(in Chinese) [20] 曾声奎,Michael G.Pecht,吴际,故障预测与健康管理技术的现状与发展[J].航空学报,2005,26(5):626-632 Zen Shengkui,Michael G.Pecht,Wu Ji.Status and perspectives of prognostics and health management technologies[J].Acta Aeronautica et Astronautica Sinica,2005,26(5): 626-632 (in Chinese) [21] John W Sheppard,Mark A Kaufman,Timothy J Wilmering.IEEE standards for prognostics and health management[J].IEEE Aerospace and Electronic Systems Magazine,2009,24(9): 34-41 [22] Fatih Camci.System maintenance scheduling with prognostics information using genetic algorithm[J].IEEE Transactions on Reliability,2009,58(3):539-552 [23] Eva L Suarez,Michael J Duffy,Robert N Gamache,et al.Jet engine life prediction system integrated with prognostics and health management //2004 IEEE Aerospace Conference Proceedings.Montana: AIAA,2004:3596-3602 [24] Todd D Batzel,David C Swanson.Prognostics and health management of aircraft power generators[J].IEEE Transactions on Aerospace and Electronic System,2009,24(2):473-483 [25] Jon Dunsdon,Mark Harrigton.The application of open system architecture for condition based maintenance to complete IVHM //2008 IEEE Aerospace Conference.Montana: AIAA,2008:1-9
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views(2609) PDF downloads(8) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return