Citation: | Li Xiaoyang, Jiang Tongmin, Xiao Lianghuaet al. Development algorithm of single sampling inspection plan of pass-fail experiment[J]. Journal of Beijing University of Aeronautics and Astronautics, 2005, 31(08): 904-907. (in Chinese) |
[1] 何国伟,戴慈庄.可靠性试验技术[M].北京:国防工业出版社,1995.88~97 He Guowei, Dai Cizhuang. The technology of reliability experiment[M]. Beijing:National Defence Industry Press, 1995. 88~97 (in Chinese) [2] GB/T 5080.5-1985, 设备可靠性试验成功率的验证方案[S] B/T 5080.5-1985, Equipment reliability testing——compliance test plan for success ratio[S](in Chinese) [3] Jeong H S, Park J I, Yum B J. Development of thybrid sampling plans for exponential lifetime distributions[J]. Journal of Applied Statistics, 1996, 23(6):601~608 [4] Richard L L, Byron J F. Development of operating characteristics (OC) curves for acceptance sampling plans[J]. International Journal of Quality & Reliability Management, 1992, 9(6):126~130 [5] Parkinson R C. The hidden costs of reliability and failure in launch systems[J]. Journal of Reducing Space Mission Cost, 1998, 1(3):263~273
|