Citation: | Qian Xianzhi, Zheng Lianyu, Wei Liet al. Visual planning and estimating of multi-process routes[J]. Journal of Beijing University of Aeronautics and Astronautics, 2005, 31(07): 770-774. (in Chinese) |
[1] 黄新刚,王先逵. 可视化工艺规程[J] 算机集成制造系统,2000,6(1):31~34 Huang Xingang,Wang Xiankui.Visual process planning[J] CIMS, 2000,6(1):31~34(in Chinese) [2] Chulho Chung, Qingjin Peng. The development of a web-cented VR-CAPP system .In:Advances in Agile Manufacturing-ICAM . Beijing:China Machine Press, 2003.369~376 [3] 褚学宁. 基于视觉形象思维的人机协同智能工艺设计系统研究 .合肥:合肥工业大学CIMS研究所,2001 Chu Xuening. Study on man-machine cooperative process planning system . Heifei:CIMS Graduate School, Hefei University of Technology, 2001 (in Chinese) [4] Peng Q, Hall F R, Lister P M. Application and evaluation of VR-based CAPP system[J] Journal of Materials Processing Technology, 2000,107:153~159 [5] Yang Y N, Parsaei H R, Leep H R. A prototype of a feature-based multiple-alternative process planning system with scheduling verification[J] Computers & Industrial Engineering, 2001,39:109~124 [6] Chen Y J. An integrated process planning and production scheduling framework for mass customization . Hongkong:Industrial Engineering and Engineering Management, Hongkong University of Science and Technology, 2003 [7] 程光耀,孙厚芳,雷贺功,等.CAPP多工艺设计方案的模糊综合评价[J] 京理工大学学报, 2004,24(3):197~200 Cheng Guangyao, Sun Houfang, Lei Hegong, et al. Fuzzy synthetic estimation of multi-process planning schemes in CAPP[J] Transactions of Beijing Institute of Technology, 2004,24(3):197~200(in Chinese)
|