Citation: | Wang Jing, Xi Yang, Han Yonget al. Optimized evaluation point designing for R&D project[J]. Journal of Beijing University of Aeronautics and Astronautics, 2005, 31(05): 556-560. (in Chinese) |
[1] 陈国权.并行工程管理方法与应用[M].北京:清华大学出版社,1998 Chen Guoquan. The application and manage method of concurrent engineering [M].Beijing:Tsinghua University Press,1998(in Chinese) [2] Smith R P. The historical roots of concurrent engineering fundamentals[J]. IEEE Transactions on Engineering Management,1997, 44(1):67~78 [3] 朱文海.并行工程关键使能技术及其发展趋势[J].现代防御技术,2001,29(2):56~64 Zhu Wenhai. Enable technologies and trend of concurrent engineering[J]. Modern Defence Technology,2001,29(2):56~64 (in Chinese) [4] 李伯虎,全春来,朱文海,等.并行工程与拟实制造[M].北京:中国经济出版社,1999 Li Bohu, Quan Chunlai, Zhu Wenhai, et al. Concurrent engineering and virtual manufacturing[M]. Beijing:Publishing Company of Chinese Economy,1999(in Chinese) [5] 任卫斌,邱江红. 并行工程在重点型号产品研制生产中的应用尝试[J].工业工程与管理,2002,(6):62~64 Ren Weibin,Qiu Jianghong.The application of CE in skystone manufacturing[J]. Industrial Engineering and Management,2002,(6):62~64(in Chinese) [6] 张善轩.企业风险管理[M].广州:广东经济出版社,1999 Zhang Shanxuan. Commercial risk management[M].Guangzhou:Publishing Company of Guangdong Economy,1999 (in Chinese) [7] 李玉家,胡宗武,金 烨.并行产品开发过程中的任务分配问题研究[J].中国机械工程,2002,13(7):580~583 Li Yujia, Hu Zongwu, Jin Ye. Research on task distribution in concurrent product development[J]. Chinese Journal of Mechanical Engineering,2002,13(7):580~583(in Chinese) [8] Yassine A A. A decision analytic framework for evaluating concurrent engineering[J]. IEEE Trans on Engineering Management, 1999, 46(2):144~156
|