ChecklistBased Process Tailoring Method

  • Received Date: 29 Jan 2001
  • Publish Date: 31 May 2003
  • It is a key and complex technique that tailors the organization's standard softw are p rocess to get the defined software process fitting the specific characteristics of the project. The organization's standard software process was discussed. The pr ocess tailoring was discussed. Four aspects impacting on process tailoring were analyzed. A checklist-based process tailoring method(CPTM)was presented. The p rocedures of process tailing using CPTM were described. An application case of t he CPTM was introduced. It proves that the process tailoring can be conducted sm oothly with CPTM and the investment for software organizations can be reduced gr eatly in process tailoring.

     

  • loading
  • [1] Carnegie Mellon University/Software Engineering Institute. The capability ma turity model:Guidelines for improving the software process[M]. USA:Addison- Wesley Publishing Company, 1995. [2] Ginsberg M, Quinn L. Process tailoring and the software capability maturity model. CMU/SEI-94-TR-024, USA:Software Engineering Institut e, 1994. [3] Humphrey W. Managing the software process[M]. USA:Addison-Wesley, 1992. [4] Boehm D, Barry W. Software engineering economics[M]. NJ:Prentice- Hall, 1981. [5] Park D, Robert E. The central equations of the PRICE software cost mo del. Proceeding of the Fourth Annual COCOMO User's Group Meeting. Pitt sburgh:Software Engineering Institute,1988. [6] Herd J R, Postak J N, Russel W E, et al. Software cost estimation study-study result. RADC-TR-77-220,USA:Doty Associates, 1977. [7] Cockburn A. Selecting a project's methodology[J]. I EEEE Software,2000,(4):64~71
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views(2202) PDF downloads(8) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return