Citation: | Xiao Boping, Kang Rui, Wang Naichaoet al. Optimal of initial spares scenario in civil aviation[J]. Journal of Beijing University of Aeronautics and Astronautics, 2010, 36(9): 1057-1061. (in Chinese) |
[1] Abell J B,Lengel J E,Slay F M.Toward improved initial provisioning strategies:the F-16 case .ADA115824,1982 [2] Mills M G.Initial provisioning with the Dyna-Metric inventory model .ADA161449,1985 [3] Yang S C,Du Z W.Criticality evaluation for spare parts initial provisioning // Reliability and Maintainability Symposium.Annual Reliability and Maintainability Symposium,2004 Proceedings(International Reliability Physics Symposium Proceedings). Darers, USA:IEEEE,2004:507-513 [4] Sherbrooke C C.Optimal inventory modelling of systems:multi-Echelon techniques[M].2nd ed.New York:Wiley,2002:19-44 [5] Blanchard B S.Logistics engineering and management[M].6th ed.New Jersey:Prentice Hall,2004:36-96 [6] GJB4355-2002备件供应规划要求[S] GJB4355-2002 Spares provisioning requirements[S](in Chinese) [7] 肖波平.利用逻辑决断图确定民机初始备件项目 //王自力.航空可靠性工程技术.北京:国防工业出版社,2006:417-420 Xiao Boping.Civil aviation initial spares ascertained by logic diagram //Wang Zili.Aviation Reliability Engineering and Technology,Beijing:National Defense Industry Press,2006:417-420(in Chinese) [8] Algorithms and methods in OPUS10[M].5th ed.Sweden:Systecon AB,2004:16-28 [9] OPUS10 user’s reference-system and logistics engineering [M].5th ed.Sweden:Systecon AB,2002:25-30
|