Citation: | Qiu Yanlin, Zhang Wenjin. Equipments support footprint forecast model based on support activity flow[J]. Journal of Beijing University of Aeronautics and Astronautics, 2011, 37(1): 81-85. (in Chinese) |
[1] MIL-HDBK-502.Acquisition Logistics[S].DOD,1997 [2] Currie Karen W.Air force journal of logistics.development and analysis of a dual-role fighter deployment footprint logistics planning model .ADA328680,1997 [3] Maxwell David R.Estimating resource requirements to support multi-echelon F-15E deployments .Ohio: Air University,2005 [4] Martin Joseph D.Development and analysis of a dual-role fighter deployment footprint logistics planning equation .Ohio: Air University,1996 [5] 郭霖瀚,康锐,康晓明.装备群保障规模预测方法研究[J].系统工程与电子技术,2009,31(5): 1262-1265 Guo Linhan,Kang Rui,Kang Xiaoming.Equipment support footprint forecast method research[J].System Engineering and Electronics,2009,31(5): 1262-1265(in Chinese) [6] 单志伟,叶红兵,曹军海,等.使用与维修工作分析与保障资源需求确定[J].装甲兵工程学院学报,2001,15(1): 71-76 Shan Zhiwei,Ye Hongbing,Cao Junhai,et al.Operation and maintenance task analysis and support resource requisition ascertain[J].Journal of Armored Force Engineering Institute,2001,15(1): 71-76(in Chinese) [7] Benjamin S Blanchard.Logistics engineering and management[M].6th ed. New Jersey: Pearson Prentice Hall,2003: 353-356 [8] Zhang W J,Kang R,Guo L H,et al.Study on military equipment support modeling and simulation[J].Chinese Journal of Aeronautics,2005,18(2): 142-146
|