Citation: | Chen Zhengping, Fu Guicui, Zhao Youhuet al. Improved analysis method of risk priority number[J]. Journal of Beijing University of Aeronautics and Astronautics, 2011, 37(11): 1395-1399. (in Chinese) |
[1] GJB/Z1391-2006 故障模式、影响及危害性分析指南[S] GJB/Z1391-2006 Guide to failure mode,effects and critically analysis[S](in Chinese) [2] 王贵宝,黄洪钟,张小玲.风险可能数——一种基于最大信息熵理论的风险度量和风险排序新方法[J].航空学报,2009,33(9):1683-1690 Wang Guibao,Huang Hongzhong,Zhang Xiaoling.Risk possib-ility number—a dew model for risk evaluation and priorit-ization based on maximum entropy theory[J].Acta Aeronautica et Astronautica Sinica,2009,33(9):1683-1690(in Chinese) [3] Childs Joseph A.Turning multiple PFMECA results into an optimal action plan// Proceedings Annual Reliability and Maintainability Symposium.Fort Worth,USA:IEEE,2009:412-416 [4] Kai Meng Tay.On fuzzy inference system based failure mode and effect analysis (FMEA) methodology// 2009 International Conference of Soft Computing and Pattern Recognition.Ayer Keroh,Malaysia:IEEE,2009:329-334 [5] Bowles John B.An assessment of RPN prioritization in a fail-ure modes effects and criticality analysis//Proceedings Annual Reliability and Maintainability Symposium.Tampa Flor-ida:IEEE,2003:380-386 [6] 胡玺良,张代胜.探析基于寿命成本的FMEA [J].现代机械,2007(1):4-7 Hu Xiliang,Zhang Daisheng.The exploration of FMEA based on life cost[J].Modern Machinery,2007(1):4-7(in Chinese) [7] Kmenta Steven,Kosuke Ishii.Scenario-bases FMEA:a life cycle cost perspective// 2000 ASME Design Engineering Technical Conferences.Baltimore,Maryland:ASME,2000:10-14 [8] Niu Yumei.The optimization of RPN criticality analysis meth-od in FMECA// International Conference on Apperceiving Computing and Intelligence Analysis(ICACIA2009).Chengdu,China:IEEE,2009:166-170 [9] 康锐.石荣德.FMECA技术及其应用[M].北京:国防工业出版社,2006:88-101 Kang Rui,Shi Rongde.FMECA technique and application [M].BeiJing:National Defense Industry Press,2006:88-101(in Chinese) [10] Iranmanesh H,Jalili M,Pirmoradi Z.Developing a new struct-ure for determining time risk priority using risk breakdown matrix in EPC projects// 2007 IEEE International Conference on Industrial Engineering and Engineering Management.Singa-pore :IEEE,2007:999-1003
|