Citation: | Wang Yan, Ma Lin, Wen Jia, et al. Maintenance-support model of materiel considering support equipment failure[J]. Journal of Beijing University of Aeronautics and Astronautics, 2012, 38(1): 123-127. (in Chinese) |
[1] 王乃超,康锐,王禹.基于产品维修策略的保障设备需求量计算模型研究[J].系统工程与电子技术,2009,31(5):1266-1269 Wang Naichao,Kang Rui,Wang Yu.Research on support equipment number determination model basing on item repair policy[J].System Engineering and Electronics,2009, 31(5):1266-1269(in Chinese) [2] 郭霖瀚,康锐,文佳.以保障活动为中心的装备保障资源数量预测[J].航空学报, 2009,30(5):919-924 Guo Linhan, Kang Rui,Wen Jia,Quantitative forecast of support activity centered equipment support resources[J].Acta Aeronautica et Astronautica Sinica,2009,30(5):919-924(in Chinese) [3] 孙 蛟,虞健飞,辛文逵.基于仿真的军用飞机保障设备利用率计算模型[J].系统仿真学报,2009,21(11):3219-3221 Sun Jiao,Yu Jianfei,Xin Wenkui.Military aircraft support equipment utilization rate computing model based on simulation[J].Journal of System Simulation,2009,21(11) :3219-3221(in Chinese) [4] 郭红芬,刘福胜.利用排队模型优化保障设备数量[J].装甲兵工程学院学报,2005,19(1):29-31 Guo Hongfen,Liu Fusheng.Use queuing theory model to optimize the quantity of the support equipment[J].Journal of Acadamy of Armored Force Engineering,2005,19(1):29-31(in Chinese) [5] 郭彩芬,王宁生.基于排队理论优选工作站设备数量[J].工业技术经济,2004, 23(3):101-102 Guo Caifen,Wang Ningsheng.Optimize equipment number basing on queuing theory[J].Industrial Technology & Economy,2004, 23(3):101-102(in Chinese) [6] 郭霖瀚,康锐.基本作战单元的任务持续性仿真度量模型研究[J].系统仿真学报,2009,2(21):325-329 Guo Linhan, Kang Rui.Individual operational unit sustainability simulation measure model research[J].Journal of System Simulation,2009,21(2):325-329(in Chinese) [7] 郭霖瀚,康锐,基本作战单元修复性维修过程建模仿真[J].北京航空航天大学学报,2007,33(1):27-71 Guo Linhan, Kang Rui.Base operational unit corrective maintenance process modeling and simulation[J].Journal of Beijing University of Aeronautics and Astronautics,2007,33(1):27-71(in Chinese) [8] Warrington Les,Jones Jeffery A,Davis Neil.Modeling of maintainance,within discrete event simulation //Proceedings of the Annual Reliability and Maintainability Symposium.Seattle:IEEE,2002: 260-265 [9] Craig R W.A methodology for addressing support equipment obsolescence[J].Aerospace and Electronic Systems Magazine,2002,5(17):20-25 [10] Tracy M C Ⅱ,Pavek D F,Schroeder J P Schroeder.A support equipment improvement opportunity //Aerospace and Electronics Conference,NAECON 1997.Proceedings of the IEEE 1997 National.Dayton,OH,USA:IEEE,1997,1:438-445 [11] Nguyen H D,Miller I A.Reliability and efficiency of electrical ground support equipment through automation.modulazition,and standardization[J].Autotestcon 2007 IEEE,2007:311-320 [12] Feeney G J,Sherbrooke C C.The (s-1,s) inventory policy under compound poisson demand[J].Management Science,1966,12(5):391-411 [13] Zotti J M,Blount A.An approach to reducing maintenance and development costs of complex support equipment //Systems Readiness: Test Technology for the 21st Century-Conference.Atlanta,GA,USA: ,1995,8: 356-36 [14] Brown James M,Chasteen Joseph W.Ground support equipment for the pershing weapon system[J].Aerospace and Electronic Systems Society,1966,4:729-745
|