Citation: | Wang Rui, Li Qingmin, Ruan Mingzhi, et al. Optimization of repairable spare parts based on combat unit mission success[J]. Journal of Beijing University of Aeronautics and Astronautics, 2012, 38(8): 1040-1045. (in Chinese) |
[1] |
董岳, 于永利, 张柳,等.装备作战单元任务可信度评估方法[J].军械工程学院学报,2009,21(6):10-13 Dong Yue,Yu Yongli,Zhang Liu,et al.Estimation on mission dependability of equipment combat unit [J].Journal of Ordnance Engineering College,2009,21(6):10-13(in Chinese)
|
[2] |
李羚玮,张建军,张涛,等.作战单元装备稳态可用度评估模型及其求解算法研究[J].兵工学报,2010,31(6):110-123 Li Lingwei,Zhang Jianjun,Zhang Tao,et al.Study on model and algorithm for stationary availability evaluation of combat unit[J].Acta Armanentarii,2010,31(6):110-123(in Chinese)
|
[3] |
聂成龙,张柳,于永利,等.多阶段任务系统任务持续能力仿真模型研究[J].系统仿真学报,2008,20(3):729-732 Nie Chenglong,Zhang Liu,Yu Yongli,et al.Research to PMS mission sustainability simulating models [J].Journal of System Simulation,2008,20(3):729-732(in Chinese)
|
[4] |
封会娟,于永利,张柳,等.聚合级装备作战单元机动防空任务可靠性仿真[J].系统仿真学报,2010,22(7):1728-1732 Feng Huijuan,Yu Yongli,Zhang Liu,et al.Mission reliability simulation of aggregated equipment combat units for mission of mobile aerial defense [J].Journal of System Simulation,2010,22(7):1728-1732(in Chinese)
|
[5] |
刘芳,赵建印,郭波.基于EOOPN的作战单元任务成功性评估仿真模型[J].兵工学报,2007,28(4):481-486 Liu Fang,Zhao Jianyin,Guo Bo.Mission success evaluation model based on EOOPN for the division-brigade combat units[J].Acta Armanentarii,2007,28(4):481-486(in Chinese)
|
[6] |
章文晋.任务驱动的综合保障建模框架研究 .北京:北京航空航天大学系统工程系,2003 Zhang Wenjin.Study on mission-driven integrated logistical support modelling framework .Beijing:Department of System Engineering, Beijing University of Aeronautics and Astronautics,2003(in Chinese)
|
[7] |
郭霖瀚,康锐.基本作战单元任务持续性仿真度量模型研究[J].系统仿真学报,2009,21(2):325-329 Guo Linhan,Kang Rui.Individual operational unit sustainability simulation measure model research [J].Journal of System Simulation,2009,21(2):325-329(in Chinese)
|
[8] |
Sherbrooke C C.METRIC:A multi-echelon technique for recoverable item control [J].Operations Research,1968,16(2):122-141
|
[9] |
Sherbrooke C C.Optimal inventory modeling of system:multi-echelon techniques[M].2nd ed.Boston:Artech House,2004,74-81
|
[10] |
Hoong Chuin Lau,Huawei Song,Chuen Teck See,et al.Evaluation of time-varying availability in multi echelon spare parts systems with passivation[J].European Journal of Operational Research,2006,170(1):91-105
|
[11] |
王乃超,康锐.基于备件保障概率的多级库存优化模型[J].航空学报,2009,30(6):1043-1047 Wang Naichao,Kang Rui.Optimization of multi-echelon repairable item inventory systems with fill rate as objective[J].Acta Aeronautica et Astronautica Sinica,2009,30(6):1043-1047(in Chinese)
|
[12] |
Sherbrooke C C.VARI-METRIC:Improved approximation for multi-indenture,multi-echelon availability models[J].Operations Research,1986,34(2):311-319
|
[13] |
Kaplan A.Incorporating redundancy considerations into stockage models [J].Naval Research Logistics,1989,36:625-638
|