Citation: | Liu Wei, Meng Xin, Zheng Jianhuaet al. Multi-machine scheduling problem with multi-time windows: model and algorithm[J]. Journal of Beijing University of Aeronautics and Astronautics, 2009, 35(3): 330-333. (in Chinese) |
[1] Cheng T.A state-of-the-art review of parallel machine scheduling research [J]. European Journal of Operation Research,1990,47:271-292 [2] Fisher M. The Lagrangian relaxation method for solving integer programming problems [J]. Mgmt Sci,1981,27:1-18 [3] Muckstadt J A,Koening S A. An application of Lagrangian relaxation to scheduling in power-generation systems [J]. Oper Res,1977,25: 387-403 [4] Dincbas M. The constraint logic programming language CHIP [J]. Proceedings of International Conference on Fifth Generation Computer Systems, 1988,1:693-702 [5] Akker V. Time-indexed formulations for machine-scheduling problems: column generation [J]. Informs J Comput,2000,12(2):111-124 [6] Hoitomt D. Scheduling job with simple precedence constraints on parallel machines [J]. Control Syst Mag,1990,10:34-40
|