Citation: | Li Xiaobai, Cui Xiuling, Lang Ronglinget al. Forecasting method for aeroengine performance parameters[J]. Journal of Beijing University of Aeronautics and Astronautics, 2008, 34(03): 253-256. (in Chinese) |
[1] 胡金海,谢寿生. 基于AR模型对滑油中金属元素含量的预测[J].燃气涡轮试验与研究,2003,16(1):32-36 Hu Jinhai,Xie Shousheng. AR model-based prediction of metal content in lubricating oil[J]. Gas Turbin Experiment and Reseach,2003,16(1):32-36(in Chinese) [2] Xu K, Xie M,Tang L C. Application of neural networks in forecasting engine systems reliability[J]. Applied Soft Computing,2003:255-268 [3] 王树明,夏国平.基于BP神经网络的飞行动态实时预测方法[J].北京航空航天大学学报,2001,27(6):636-639 Wang Shuming, Xia Guoping. Method of flying dynamic read-time forecast based-on BP neural network[J].Journal of Beijing University of Aeronautics and Astronautics,2001,27(6):636-639(in Chinese) [4] 付尧明.民用涡扇发动机在使用和维护中的EGT裕度管理[J].航空工程与维修,2005,1:44-45 Fu Yaoming. Management of EGT margin of civil turofan in the use and mainteance[J]. Aviation Engineering & Mainteance,2005,1:44-45(in Chinese) [5] 杨福生.小波变换的工程分析与应用[M].北京:科学出版社,1999:64-70,95-97 Yang Fusheng. Project analysis and application of wavelet transformation[M]. Beijing: Science Press, 1999: 64-70, 95-97 (in Chinese) [6] Box G E P,Jenkins G M. Time series analysis-forecasting and control[M].San Francisco:Holden-Day Inc,1976:21-182 [7] 张树京,齐立心. 时间序列分析简明教程[M].北京:北方交通大学出版社,2003:66-83,112-116 Zhang Shujing,Qi Lixin. Time series analysis tutorial[M].Beijing:Northern Jiaotong University Press, 2003,9:66-83,112-116 (in Chinese)
|