Volume 32 Issue 12
Dec.  2006
Turn off MathJax
Article Contents
Wang Zhonglin, Yin Baolin. Prototype selection of customized development process based on open source software[J]. Journal of Beijing University of Aeronautics and Astronautics, 2006, 32(12): 1490-1494. (in Chinese)
Citation: Wang Zhonglin, Yin Baolin. Prototype selection of customized development process based on open source software[J]. Journal of Beijing University of Aeronautics and Astronautics, 2006, 32(12): 1490-1494. (in Chinese)

Prototype selection of customized development process based on open source software

  • Received Date: 20 Dec 2005
  • Publish Date: 31 Dec 2006
  • Selecting an appropriate prototype for customized development process will increase development efficiency, decrease development costs and shorten development time. Based on the COCOMO(costructive cost model) II model, a new software cost assessment method was proposed to analyze the influence of the key factors, such as the function differences, system performances and scale, stability, in the development process. The influences of the key factors on the equivalent code, which is essential in the cost estimation formula, were quantified. A practical project shows that the assessment error is about 15%, well within the 40% acceptable threshold in COCOMO II model.

     

  • loading
  • [1] January 2005 Web server survey. Netcraft, 2005. http://news.netcraft.com/archives/2005/01/01/january_2005_web_server_survey.html [2] Linux has 25% share in servers. ZDNet Research, 2005. http://www.itfacts.biz/index.php?id=P675 [3] Jrgensen M. Software effort estimation by analogy and regression toward the mean[J]. Journal of Systems and Software, 2003,68(3):253-262 [4] Shepperd M, Kitchenham B. Effort estimation using analogy Proceedings of the International Conference on Software Engineering. Berlin:IEEE CS Press, 1996:170-178 [5] Shepperd M, Scholfield C. Estimating software project using analogy [J]. IEEE Transactions on Software Engineering, 1997, 23(12):736-743 [6] Jrgensen M, Molkken K. Combination of software development effort prediction intervals:why, when and how Fourteenth IEEE Conference on Software Engineering and Knowledge Engineering. Ischia, Italy:,2002:425-428 [7] Jrgensen M, Teigen K H. Uncertainty intervals versus interval uncertainty:an alternative method for eliciting effort prediction intervals in software development projects International Conference on Project Management. Singapore:,2002:343-352 [8] Hill J, Thomas L C, Allen D E. Experts′ estimates of task durations in software development projects[J]. International Journal of Project Management, 2000, 18(1):13-21 [9] Molkken K. Expert estimation of Web-development effort:individual biases and group processes. Department of Informatics, University of Oslo, 2002 [10] Boehm B W. Software engineering economics[M]. Englewood Cliffs, N J:Prentice Hall, 1981 [11] Granja-Alvarez J C, Barraco-Garcia′ M J. A method for estimating maintenance cost in a software project:a case study[J]. Software Maintenance Research and Practice, 1997:161-175 [12] Beohm B W. Software cost estimation with COCOMO II[M]. Englewood Cliffs, NJ:Prentice Hall, 1981 [13] Caldiera G, Antoniol G, Fiutem R, et al. A definition and experimental evaluation of function points for object-oriented systems In Proc of the Fifth International Symposium on Software Metrics-METRICS98. Bethesda, MD:,1998:167-178 [14] IFPUG. Function point counting practices manual, Release 4.0[M]. Westerville, Ohio:International Function Point Users Group, 1994 [15] Minkiewicz A. Measuring object-oriented software with predictive object points In Proceedings of European Software Control and Metrics Conference. Atlanta:, 1997 [16] Sneed H. Estimating the costs of object-oriented software In Proceedings of Software Cost Estimation Seminar.Durham, UK:,1995 [17] Ligett D. Extensions to incremental development COCOMO Proceedings Eighth International Forum on COCOMO and Software Cost Modeling. Pittsburg, P A:Software Engineering Institute, Carnegie Mellon University, 1993 [18] Madachy R. System dynamics and COCOMO:complementary modeling paradigms Proceedings of the Tenth International Forum on COCOMO and Software Cost Modeling. Pittsburgh, P A:SEI, 1995 [19] Reifer D, Boehm B, Chulani S. The rosetta stone:making COCOMO estimates work with COCOMO II[J]. The Journal of Defense Engineering, 1999,12(2):11-15
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views(2429) PDF downloads(1486) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return