Volume 32 Issue 07
Jul.  2006
Turn off MathJax
Article Contents
Wu Qiang, Wang Zhanlin, Li Jia, et al. Development of teleoperation testing system for Stewart platform[J]. Journal of Beijing University of Aeronautics and Astronautics, 2006, 32(07): 819-822. (in Chinese)
Citation: Wu Qiang, Wang Zhanlin, Li Jia, et al. Development of teleoperation testing system for Stewart platform[J]. Journal of Beijing University of Aeronautics and Astronautics, 2006, 32(07): 819-822. (in Chinese)

Development of teleoperation testing system for Stewart platform

  • Received Date: 21 Sep 2005
  • Publish Date: 31 Jul 2006
  • Teleoperation testing system for Stewart platform was developed to study Stewart platform teleoperation stability under condition of large time delay. Ethernet was used to simulate the telecommunication channel, which linked two Stewart platforms control systems. DirectX technology was used to build user input interface and video feedback without consideration of hardware. Open graphic library(OpenGL) technology was used to establish virtual operation environment, through which time delay could be compensated. To obtain higher accuracy, neural network forward kinematics solution, instead of traditional methods, was used to drive virtual models. Communication bandwidth was monitored online to assure operation command's priority. The continuity of video transmission was guaranteed by changing transmission rate. The result shows that platform is easily controlled by operator's command input, position and attitude information is feedback through virtual operation environment and video, testing system meets design requirements.

     

  • loading
  • [1] 赵丁选,黄海东,宫文斌,等.遥操作工程机器人系统临场感技术研究[J].工程设计学报,2002,9(3):127-130 Zhao Dingxuan, Huang Haidong, Gong Wenbin, et al. Study on the technology of telepresence in operating a construction telerobot system[J].Journal of Engineering Design, 2002,9(3):127-130(in Chinese) [2] 郭坚,陈一民,黄薇.基于DirectShow和RTP的远程机器人监视系统[J]. 计算机工程,2005,31(5):197-199 Guo Jian, Chen Yimin, Huang Wei. A remote robot monitoring system based on directShow and RTP[J]. Computer Engineering, 2005, 31(5):197-199(in Chinese) [3] 黄真. 并联机器人机构学理论及控制[M]. 第2版. 北京:机械工业出版社,1997:36 Huang Zhen. Mechanism theory and control for parallel robot[M]. 2nd ed. Beijing:China Machine Press, 1997:36(in Chinese) [4] 颜庆津. 数值分析[M]. 北京:北京航空航天大学出版社,2000:140 Yan Qingjin. Numerical analysis[M]. Beijing:Beijing University of Aeronautics and Astronautics Press, 2000:140(in Chinese) [5] Roberto Oboe. Force-reflecting teleoperation over the Internet:the JBIT project[J]. Proceeding of the IEEE, 2003, 91(3):449-462
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views(2660) PDF downloads(808) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return