Citation: | Wu Qiang, Wang Zhanlin, Li Jia, et al. Development of teleoperation testing system for Stewart platform[J]. Journal of Beijing University of Aeronautics and Astronautics, 2006, 32(07): 819-822. (in Chinese) |
[1] 赵丁选,黄海东,宫文斌,等.遥操作工程机器人系统临场感技术研究[J].工程设计学报,2002,9(3):127-130 Zhao Dingxuan, Huang Haidong, Gong Wenbin, et al. Study on the technology of telepresence in operating a construction telerobot system[J].Journal of Engineering Design, 2002,9(3):127-130(in Chinese) [2] 郭坚,陈一民,黄薇.基于DirectShow和RTP的远程机器人监视系统[J]. 计算机工程,2005,31(5):197-199 Guo Jian, Chen Yimin, Huang Wei. A remote robot monitoring system based on directShow and RTP[J]. Computer Engineering, 2005, 31(5):197-199(in Chinese) [3] 黄真. 并联机器人机构学理论及控制[M]. 第2版. 北京:机械工业出版社,1997:36 Huang Zhen. Mechanism theory and control for parallel robot[M]. 2nd ed. Beijing:China Machine Press, 1997:36(in Chinese) [4] 颜庆津. 数值分析[M]. 北京:北京航空航天大学出版社,2000:140 Yan Qingjin. Numerical analysis[M]. Beijing:Beijing University of Aeronautics and Astronautics Press, 2000:140(in Chinese) [5] Roberto Oboe. Force-reflecting teleoperation over the Internet:the JBIT project[J]. Proceeding of the IEEE, 2003, 91(3):449-462
|