Volume 32 Issue 08
Aug.  2006
Turn off MathJax
Article Contents
Du Fuzhou, Tang Xiaoqing, Sun Jinget al. ARL computation and parameters optimization for MEWMA control chart based on the Markov chain[J]. Journal of Beijing University of Aeronautics and Astronautics, 2006, 32(08): 974-978. (in Chinese)
Citation: Du Fuzhou, Tang Xiaoqing, Sun Jinget al. ARL computation and parameters optimization for MEWMA control chart based on the Markov chain[J]. Journal of Beijing University of Aeronautics and Astronautics, 2006, 32(08): 974-978. (in Chinese)

ARL computation and parameters optimization for MEWMA control chart based on the Markov chain

  • Received Date: 14 Sep 2005
  • Publish Date: 31 Aug 2006
  • Average run length(ARL) is one of the important indices in performance evaluation on quality control charts, the research on which will set up the foundation of quality control chart parameters optimization, performance evaluation and application. An ARL computation model based on the Markov chain was studied for the multivariate exponentially weighted moving average(MEWMA) control chart, the Matlab program was designed and implemented. The convergence of the algorithm and the performance of the MEWMA control chart in different conditions through the analysis of the computation results were analyzed. A procedure for parameters optimization of MEWMA control chart was proposed. An computation example and some optimization results was presented.

     

  • loading
  • [1] Brook D, Evans D A. An approach to the probability distribution of CUSUM length [J]. Biometrika, 1972, 59:539-549 [2] Runger G C, Prabhu S S. A Markov chain model for the multivariate exponentially weighted moving averages control chart [J]. Journal of the American Statistical Association, 1996, 91(436):1701-1706 [3] Lowry C A, Woodall W H. A multivariate exponentially weighted moving average control chart[J]. Technometrics, 1992, 34(1):46-53 [4] Rigdon S E. A double-integral equation for the average run length of a multivariate exponentially weighted moving average control chart [J]. Statistics & Probability Letters, 1995,24:365-373 [5] Prabhu S S, Runger G C. Designing a multivariate EWMA control chart[J]. Journal of Quality Technology, 1997, 29(1):8-15 [6] Sonesson C. Evaluations of some exponentially weighted moving average methods [J]. Journal of Applied Statistics, 2003, 30(10):1115-1133
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views(3546) PDF downloads(1455) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return