Citation: | Tang Zhongxing, Han Chao. Agile satellite attitude maneuver strategy study based on directed acyclic graph[J]. Journal of Beijing University of Aeronautics and Astronautics, 2014, 40(5): 644-650. doi: 10.13700/j.bh.1001-5965.2013.0347(in Chinese) |
[1] |
Baudoin A. Beyond spot 5:pleiades,part of the French-Italian program orfeo[C]//The 20th Int Archives Photogrammetry and Remote Sensing Congr.Istanbul,Turkey:ISPRS,2004:260-267
|
[2] |
张新伟,戴君, 刘付强.敏捷遥感卫星工作模式研究[J].航天器工程,2011,20(4):32-38 Zhang Xinwei,Dai Jun,Liu Fuqiang.Research on working mode of remote sensing satellite with agile attitude control[J].Spacecraft Eengineering,2011,20(4):32-38(in Chinese)
|
[3] |
Gabrel V, Moulet A,Murat C,et al.A new single model and derived algorithms for the satellite shot planning problem using graph theory concepts[J].Annals of Operations Research,1997,69:115-134
|
[4] |
Mancel C, Lopez P.Comlex optimization problems in space systems[C]//13th International Conference on Automated Planning & Scheduling(ICAP′03).Trento,Italy:ICAP,2003:1-5
|
[5] |
Li Y, Xu M Q,Wang R X.Scheduling observations of agile satellites with combined genetic algorithm[C]//Third International Conference on Natural Computation.Piscataway,NJ:IEEE,2007,3:29-33
|
[6] |
陈英武, 白保存,贺仁杰,等.遥感卫星任务规划问题研究现状与展望[J].飞行器测控学报,2008,27(5):1-8 Chen Yingwu,Bai Baocun,He Renjie,et al.A survey on mission planning for remote sensing satellites[J].Journal of Spacecraft TT&C Technology,2008,27(5):1-8(in Chinese)
|
[7] |
王钧,陈慧中, 左怀玉,等.基于时间序有向图的对地观测卫星成像预调度[J].兵工学报,2008,29(5):608-614 Wang Jun,Chen Huizhong,Zuo Huaiyu,et al.Pre-scheduling for imaging requests of earth observing satellites based on time ord-ered acyclic directed graph[J].ACTA Armamentarii,2008, 29(5): 608-614(in Chinese)
|
[8] |
Wang P, Reinelt G,Gao P,et al.A model,a heuristic and a decision support system to solve the scheduling problem of an earth observing satellite constellation[J].Computers & Chemical Engineering,2011,61(2):322-335
|
[9] |
Romain G B, Gabrel V,Antoine F.Building a really executable plan for a constellation of agile earth observation satellites[EB/OL].[2013-06-18].http://www.congrex.nl/11c05/Papers/GrassetBourdel_paper.pdf
|
[10] |
Wu G H, Liu J,Ma M H,et al.A two-phase scheduling method with the consideration of task clustering for earth observing satellites[J].Computers & Operations Research,2013,40(7):1884-1894
|
[11] |
Beaumet G, Gabrel V,Charmeau M C,et al.Feasibility of autonomous decision making on board an agile earth-observation satellite[J].Computational Intelligence,2011,27(1):123-139
|
[12] |
唐忠兴,韩潮. 敏捷卫星同轨拼幅观测姿态机动策略研究[C]//第一届高分辨率对地观测学术年会——卫星遥感与应用优秀论文集.北京:高分辨率对地观测学术委员会,2012:3-14 Tang Zhongxing,Han Chao.Study on the attitude maneuver strategy for the agile satellite in one-orbit strips-jointed observation mode[C]//The 1st High Resolution Earth Observation Annual Conference:Satellite Remote Sensing and Application.Beijing:HREOAC,2012:3-14(in Chinese)
|
[13] |
王桂平,王衍, 任嘉辰.图论算法理论、实现及应用[M].北京:北京大学出版社,2011:131-147 Wang Guiping,Wang Yan,Ren Jiachen.Graph theory,implement and application[M].Beijing:Peking University Press,2011:131-147(in Chinese)
|