Citation: | Su Zhixiong, Li Xingmei, Qi Jianxunet al. Theory and method of creating dual network model in network planning[J]. Journal of Beijing University of Aeronautics and Astronautics, 2012, (2): 257-262. (in Chinese) |
[1] |
Demeulemeester E L,Herrlelen W S.Project scheduling[M].Boston:Kluwer Academic Publishers,2002:17-48
|
[2] |
Michael D J,Kamburowski J,Stallman M.On minimum dummy arc problem[J].Operations Research,1993,27(2):153-168
|
[3] |
Elmaghraby S E,Kamburowski J.On project representationand activity floats [J].Arabian Journal of Science and Engineering,1990,15:627-637
|
[4] |
Elmaghraby S E.Activity nets:a guided tour through some recent developments[J].European Journal of Operational Research,1995,82:383-408
|
[5] |
王强,李星梅,乞建勋.双代号网络图中虚工序对时差计算公式的影响与修正[J].系统工程理论与实践,2008(6):106-114 Wang Qiang,Li Xingmei,Qi Jianxun.A research on the influence of dummy activity on float in an AOA networkand its amendments[J].Systems Engineering-Theory & Practice,2008(6):106-114(in Chinese)
|
[6] |
乞建勋,张立辉,李星梅.网络计划管理中的机动时间特性及其应用[M].北京:科学出版社,2009:22-45 Qi Jianxun,Zhang Lihui,Li Xingmei.Property and application of float in network planning management[M].Beijing:Science Publisher,2009:22-45(in Chinese)
|
[7] |
王佳,李星梅,乞建勋.基于机动时间的平行序链顺序优化算法设计[J].系统工程学报,2008,23(4):455-461 Wang Jia,Li Xingmei,Qi Jianxun.Sequencing optimalarithmetic design of parallel procedure chains basedon activity float[J].Journal of Systems Engineering,2008,23(4):455-461(in Chinese)
|
[8] |
Yakhchali S H,Ghodsypour S H.Computing latest starting times of activities in interval-valued networks with minimal time lags[J].European Journal of Operational Research,2010,200(3):874-880
|
[9] |
Sirakoulis K K.The effectiveness of resource leveling tools for resource constraint project scheduling problem[J].International Journal of Project Management,2009,27(5):493-500
|
[10] |
Karaca Z,Onargan T.The application of critical path method (CPM) in workflow schema of marble processing plants[J].Materials and Manufacturing Processes,2007,22(1):37-44
|
[11] |
Rodder W.A generalized saddlepoint theory:its application to duality theory for linear vector optimum problems[J].European Journal of Operational Researh,1977,1(1):55-59
|
[12] |
Ivanov E H,Nehse R.Some results on dual vector optimization problems[J].Optimization,1985,16(4):505-517
|
[13] |
乞建勋,李星梅,王强.等效子网络的理论与方法[J].管理科学学报,2010,13(1):40-44 Qi Jianxun,Li Xingmei,Wang Qiang.Theories and methods of creating equivalent sub-network[J].Journal of Management Sciences in China,2010,13(1):40-44(in Chinese)
|
[14] |
李星梅,乞建勋,苏志雄.自由时差定理与k阶次关键路线的求法[J].管理科学学报,2009,12(2):98-104 Li Xingmei,Qi Jianxun,Su Zhixiong.Free float theorem and algorithm of seeking the k-th order critical path[J].Journal of Management Sciences in China,2009,12(2):98-104(in Chinese)
|
[15] |
李星梅,乞建勋,苏志雄.双代号网络计划中工序机动时间蔓延性研究[J].系统工程学报,2009,24(1):39-45 Li Xingmei,Qi Jianxun,Su Zhixiong.Study of activity float spread property in activity-on-arc network planning[J].Journal of Systems Engineering,2009,24(1):39-45(in Chinese)
|
[16] |
王众托,张军.网络计划技术[M].沈阳:辽宁出版社,1984 Wang Zhongtuo,Zhang Jun.Network planning technology[M].Shenyang:Liaoning Publisher,1984(in Chinese)
|
[17] |
张连营,王亮,吕文学.网络计划的模糊分析[J].天津大学学报,2004,37(2):175-178 Zhang Lianying,Wang Liang,Lü Wenxue.Calculation and analysis of project network based on fuzzy set[J].Journal of Tianjin University,2004,37(2):175-178(in Chinese)
|
[18] |
Elmaghraby S E,Kamburowski J.The analysis of activity networks under generalized precedence relations (GPRs)[J].Management Science,1992,38(9):1245-1263
|
[19] |
杨冰.网络计划计算模型的统一[J].系统工程理论与实践,2002(3):51-55 Yang Bing.Unifying calculating models for the network Planning[J].Systems Engineering-Theory & Practice,2002(3):51-55(in Chinese)
|
[20] |
苏志雄,李星梅,乞建勋.基于CPM原理和Dijkstra算法的SPM网络计划模型及性质[J].运筹与管理,2008,17(1):148-153 Su Zhixiong,Li Xingmei,Qi Jianxun.SPM network planning model and its characteristics based on CPM theory and Dijkstra algorithm[J].Operations Research and Management Science,2008,17(1):148-153(in Chinese)
|