Volume 36 Issue 4
Apr.  2010
Turn off MathJax
Article Contents
Wen Jia, Kang Rui, Qiao Li, et al. Calculation methods for mean waiting time of maintenance support[J]. Journal of Beijing University of Aeronautics and Astronautics, 2010, 36(4): 451-454. (in Chinese)
Citation: Wen Jia, Kang Rui, Qiao Li, et al. Calculation methods for mean waiting time of maintenance support[J]. Journal of Beijing University of Aeronautics and Astronautics, 2010, 36(4): 451-454. (in Chinese)

Calculation methods for mean waiting time of maintenance support

  • Received Date: 01 Apr 2009
  • Publish Date: 30 Apr 2010
  • In order to analyze and evaluate the timeliness of the support system during the design and development phase, the concept of waiting time of maintenance support (WTMS) was discussed. The impact factors of WTMS during the design process of the support system for the equipment was analyzed, including the frequency and location of the support activities, depth of maintenance of the support sites with different lines of maintenance, distribution of the support sites and allocation of the support resources in them, transportation means between different support sites and other factors.A calculation method for the mean waiting time of maintenance support was established based on statistics and matrix theory, which used the results of supportability analysis as input and considered the difference in calculation methods between the consuming support resources and occupying support resources. A case of the calculation method was provided to verify its feasibility and correctness.

     

  • loading
  • [1] Wing Thomas E,Crow Larry H.A model for mean-time-to-repair and mean-logistics-delay-time at the system level // Annual Reliability and Maintainability Symposium.Los Angeles:IEEE,1990:389-393 [2] Wing Thomas E,Crow Larry H,Dreckman G Thomas.The effect of redundancy on the requirement for logistic support // Annual Reliability and Maintainability Symposium.Orlando:IEEE,1991:411-415 [3] Booth Gregory L.An analysis of logistics response times for requisitions of naval aviation repairable items[M].Monterey,California:Naval Postgraduate School,2002:1-101 [4] Inspector General Dept of Defense Arlington VA.Logistics response time for the direct vendor delivery process,defense supply center,Columbus .ADA367164,1999 [5] Fortunato Edward T,Eanes John T.Reducing the transportation segment of logistics response time .ADA3134988,1996 [6] Wang N C,Kang R.Analyzing of spares inventory management policy based on the analytic hierarchy process\ // ESREL2007(Risk,Reliability and Societal Safety).Stavanger:University Stavanger,2007:2037-2043 [7] 程海龙,康锐,韦艺,等.备件满足率与备件短缺量对比分析[J].北京航空航天大学学报,2008,34(5):580-583 Cheng Hailong,Kang Rui,Wei Yi,et al.The comparation analysis of fill rate and backorder[J].Journal of Beijing University of Aeronautics and Astronautics,2008,34(5):580-583(in Chinese) [8] Alfredsson P.Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities[J].European Journal of Operational Research,1997,99:584-595 [9] Diaz A,Fu M C.Models for multi-echelon repairable item inventory systems with limited repair capacity[J].European Journal of Operational Research,1997,97:480-492 [10] Blanchard Benjamin S.Logistics engineering and management[M].6 th ed.New Jersey:Pearson Prentice Hall,2003:353-356 [11] Jones James V.Integrated logistics support handbook[M].3 rd ed.London:McGraw Hill Publishing,2002,120-130 [12] Wong H,van Houtum G J,Cattrysse D,et al.Multi-item spare parts systems with lateral transshipments and waiting time constraints[J].European Journal of Operational Research,2006,171(3):1071-1093
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views(3880) PDF downloads(1677) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return