Citation: | Wen Jia, Kang Rui, Qiao Li, et al. Calculation methods for mean waiting time of maintenance support[J]. Journal of Beijing University of Aeronautics and Astronautics, 2010, 36(4): 451-454. (in Chinese) |
[1] Wing Thomas E,Crow Larry H.A model for mean-time-to-repair and mean-logistics-delay-time at the system level // Annual Reliability and Maintainability Symposium.Los Angeles:IEEE,1990:389-393 [2] Wing Thomas E,Crow Larry H,Dreckman G Thomas.The effect of redundancy on the requirement for logistic support // Annual Reliability and Maintainability Symposium.Orlando:IEEE,1991:411-415 [3] Booth Gregory L.An analysis of logistics response times for requisitions of naval aviation repairable items[M].Monterey,California:Naval Postgraduate School,2002:1-101 [4] Inspector General Dept of Defense Arlington VA.Logistics response time for the direct vendor delivery process,defense supply center,Columbus .ADA367164,1999 [5] Fortunato Edward T,Eanes John T.Reducing the transportation segment of logistics response time .ADA3134988,1996 [6] Wang N C,Kang R.Analyzing of spares inventory management policy based on the analytic hierarchy process\ // ESREL2007(Risk,Reliability and Societal Safety).Stavanger:University Stavanger,2007:2037-2043 [7] 程海龙,康锐,韦艺,等.备件满足率与备件短缺量对比分析[J].北京航空航天大学学报,2008,34(5):580-583 Cheng Hailong,Kang Rui,Wei Yi,et al.The comparation analysis of fill rate and backorder[J].Journal of Beijing University of Aeronautics and Astronautics,2008,34(5):580-583(in Chinese) [8] Alfredsson P.Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities[J].European Journal of Operational Research,1997,99:584-595 [9] Diaz A,Fu M C.Models for multi-echelon repairable item inventory systems with limited repair capacity[J].European Journal of Operational Research,1997,97:480-492 [10] Blanchard Benjamin S.Logistics engineering and management[M].6 th ed.New Jersey:Pearson Prentice Hall,2003:353-356 [11] Jones James V.Integrated logistics support handbook[M].3 rd ed.London:McGraw Hill Publishing,2002,120-130 [12] Wong H,van Houtum G J,Cattrysse D,et al.Multi-item spare parts systems with lateral transshipments and waiting time constraints[J].European Journal of Operational Research,2006,171(3):1071-1093
|