Citation: | Zhang Hanpeng, Qiu Wanhua. Product development two-factor risk model and simulation based on DSM[J]. Journal of Beijing University of Aeronautics and Astronautics, 2007, 33(05): 627-630. (in Chinese) |
[1] 徐哲,冯允成.网络计划进度的风险分析[J].系统工程理论与实践,1998,4:24-28 Xu Zhe, Feng Yuncheng. Schedule risk analysis for network planning[J]. System Engineering-Theory & Practice, 1998,4:24-28(in Chinese) [2] 钟登华,刘奎建,杨晓刚.施工进度计划柔性网络仿真的不确定性研究[J].系统工程理论与实践,2005,2:107-112 Zhong Denghua, Liu Kuijian, Yang Xiaogang. Uncertainty analysis for construction scheduling with flexible network simulation[J]. System Engineering-Theory & Practice, 2005,2:107-112(in Chinese) [3] 刘煜明,王卓甫,丁尔俊.基于一定风险水平的施工进度计划研究[J],河海大学学报(自然科学版),2006,3:227-230 Liu Yuming, Wang Zhuofu, Ding Erjun. Scheduling for construction under fixed risk probability[J]. Journal of Hehai University(Natural Sciences), 2006,3:227-230(in Chinese) [4] Browning T R. Use of dependency structure matrices for product development cycle time reduction Proceeding of the Fifth ISPE International Conference on Concurrent Engineering:Research and Applications.Tokyo:Tokyo Metroplitan Insititute of Technology,1998:89-96 [5] Browning T R, Eppinger S D. Modeling impacts of process architecture on cost and schedule risk in product development[J]. IEEE Transactions on Engineering Management, 2002, 49(4):428-443 [6] 姚咏,范文慧,熊光楞.复杂产品开发过程仿真及其优化方法研究[J].系统仿真学报,2006,3:726-730 Yao Yong, Fan Wenhui, Xiong Guangleng. Research on complex product development process simulation and its optimization[J]. Journal of System Simulation, 2006,3:726-730(in Chinese) [7] Altus S S, Kroo I M, Gage P J. A genetic algorithm for scheduling and decomposition of multidisciplinary design problems[J]. Transactions of the ASME, 1996, 118(4):486-489
|