[1] |
张青山,邹华,马军,等.制造业绿色产品评价体系[M].北京:电子工业出版社,2010:10-27 Zhang Qingshan,Zou Hua,Ma Jun,et al.Manufacturing green product evaluation system[M].Beijing:Electronic Industrial Press,2010:10-27(in Chinese)
|
[2] |
杨建新,刘炳江.中国钢材生命周期清单分析[J].环境科学学报,2002,22(4):519-522 Yang Jianxin,Liu Bingjiang.Life cycle inventory of steel products in china[J].Acta Scientiae Circumstantiae,2002,22(4):519-522(in Chinese)
|
[3] |
亿科环境科技有限公司.亿科产品与服务概述[EB/OL].[2013-04-03].
|
[4] |
林逢春,杨凯.两种一次性塑料餐盒的生命周期评价比较研究[J].华东师范大学学报:自然科学版,2004(4):122-128 Lin Fengchun,Yang Kai.Comparison of two kinds of fast food container using the life-cycle assessment (LCA) methodology[J].Journal of East China Normal University:Natural Science,2004(4):122-128(in Chinese)
|
[5] |
Hischier R,Baudin I.LCA study of a plasma television device[J].International Journal of Life Cycle Assessment,2010,15(5):428-438
|
[6] |
王晓伟,李剑峰,李方义,等.机电产品生命周期评价指标与量化方法研究[J].山东大学学报:工学版,2009, 39(5):73-78 Wang Xiaowei,Li Jianfeng,Li Fangyi,et al.A life cycle assessment indicators system and quantification methods of electromechanical products[J].Journal of Shandong University:Engineering Science,2009,39(5):73-78(in Chinese)
|
[7] |
Junnila S.Life cycle management of energy-consuming products in companies using IO-LCA[J].International Journal of Life Cycle Assessment,2008,13(5):432-439
|
[8] |
张业明,蔡茂林.气动执行器与电动执行器的运行能耗分析[J].北京航空航天大学学报,2010,36(5):560-563 Zhang Yeming,Cai Maolin.Energy consumption analysis for pneumatic actuator and electric actuator[J].Journal of Beijing University of Aeronautics and Astronautics,2010,36(5):560-563(in Chinese)
|
[9] |
张业明,蔡茂林.气动执行器的全生命周期成本分析[J].北京航空航天大学学报,2011,37(8):1006-1010 Zhang Yeming,Cai Maolin.Whole life-cycle costing analysis of pneumatic actuators[J].Journal of Beijing University of Aeronautics and Astronautics,2011,37(8):1006-1010(in Chinese)
|
[10] |
郭焱,刘红超,郭彬.产品生命周期评价关键问题研究评述[J].计算机集成制造系统,2014,20(5):1141-1148 Guo Yan,Liu Hongchao,Guo Bin.Review of key issue on product life cycle assessment[J].Computer Integrated Manufacturing Systems,2014,20(5):1141-1148(in Chinese)
|
[11] |
Helias A U H,Olivier J,Greg N,et al.UNEP/SETAC life cycle initiative:background,aims and scope[J].The International Journal of Life Cycle Assessment,2002,7(4):192-195
|
[12] |
杨洁,王洪涛,周君.铁路运输生命周期评价初探[J].环境科学研究,2013,26(9):1029-1034 Yang Jie,Wang Hongtao,Zhou Jun.Life cycle assessment of Chinese railway transportation[J].Research of Environmental Sciences,2013,26(9):1029-1034(in Chinese)
|
[13] |
Boughanmi W,Manata J P,Roger D,et al.Life cycle assessment of a three-phase electrical machine in continuous operation[J].Electric Power Applications,IET,2012,6(5):277-285
|
[14] |
Tao F,Zuo Y,Xu L D,et al.Internet of things and BOM-based life cycle assessment of energy-saving and emission-reduction of products[J].IEEE Transactions on Industrial Informatics,2014,10(2):1252-1261
|
[15] |
Zhang Y M,Cai M L.Overall life cycle comprehensive assessment of pneumatic and electric actuator[J].Chinese Journal of Mechanical Engineering,2014,27(3):584-594
|