[1] |
李屹晖.军用航空发动机全寿命费用分析研究[D].北京:北京航空航天大学,2000 Li Yihui.Analysis and research on the life cycle cost of military aero engine[D].Beijing:Beijing University of Aeronautics and Astronautics,2000(in Chinese)
|
[2] |
Brikler J L.Development and production cost estimating relationships for aircraft turbine engines[R].Rand N-1882-AF,1982
|
[3] |
刘锦,张海涛.航空发动机研制费估算工作的现状与展望[J].航空发动机,2014,40(1):75-78 Liu Jin,Zhang Haitao.Status and prospects of aeroengine development cost estimation[J].Aeroengine,2014,40(1):75-78
|
[4] |
张森,陈永革.基于参数法的3种研制费用估算模型[J].四川兵工学报,2010,31(3):53-56 Zhang Sen,Chen Yongge.Three parametric model of development cost estimating[J].Sichuan Ordnance Journal,2010,31(3):53-56(in Chinese)
|
[5] |
Sininger W B.Engine life cycle cost[R].AIAA 76-0754,1976
|
[6] |
王如根,曹平,谭崇武,等.航空发动机全寿命费用预测模型研究[J].空军工程学院学报,1992,12(3):15-19 Wang Rugen,Cao Ping,Tan Chongwu,et al.Research of life cycle cost estimating relationships of aircraft turbine engines[J].Journal of the Air Force College of Engineering,1992,12(3):15-19(in Chinese)
|
[7] |
王如义.多元线性回归中复共线问题及偏最小二乘回归分析[D].成都:西南交通大学,2004 Wang Ruyi.Multiple linear regression line in the complex of problems and partial least squares regression analysis[D].Chengdu:Southwest Jiaotong University,2004(in Chinese)
|
[8] |
纪秋颖,林健.高校生态位适宜度的数学模型及其应用[J].辽宁工程技术大学学报,2006,25(S1):260-262 Ji Qiuying,Lin Jian.Niche fitness model of colleges and universities and its application[J].Journal of Liaoning Technical University,2006,25(S1):260-262(in Chinese)
|
[9] |
张凤莲.多元线性回归中多重共线性问题的解决办法探讨[D].广州:华南理工大学,2010 Zhang Fenglian.Multiple linear regression to explore multiple solutions to the problem of linear[D].Guangzhou:South China University of Technology,2010(in Chinese)
|
[10] |
柯鹏,杨春信,杨雪松,等.重型货物空投系统过程仿真及特性分析[J].航空学报,2006,27(5):856-860 Ke Peng,Yang Chunxin,Yang Xuesong,et al.System simulation and analysis of heavy cargo airdrop system[J].Acta Aeronautica et Astronautica,2006,27(5):856-860(in Chinese)
|
[11] |
罗云宝,侯志强,崔坤林,等.基于BP神经网络的战斗机采购费用估算[J].海军航空工程学院学报,2006,21(4):463-466 Luo Yunbao,Hou Zhiqiang,Cui Kunlin,et al.Prediction for aircraft stock cost based on neural network[J].Journal of Naval Aeronautical Engineering Institute,2006,21(4):463-466(in Chinese)
|
[12] |
郭基联,张恒喜,刘晓东.飞机机体研制费用的偏最小二乘回归分析[J].数量经济技术经济研究,2001(4):121-124 Guo Jilian,Zhang Hengxi,Liu Xiaodong.Partial least squares regression analysis for airframe development cost[J].The Journal of Quantitative & Technical Economics,2001(4):121-124(in Chinese)
|
[13] |
张恩和.对我国军用航空发动机发展的思考[J].航空发动机,2001,27(3):1-3 Zhang Enhe.Reflections on China's military aero engine development[J].Aeroengine,2001,27(3):1-3(in Chinese)
|
[14] |
Curry C E.Engine life cycle cost modeling in the conceptual phase[R].AIAA 75-1288,1975
|
[15] |
Nelson J R.Relating technology to acquisition costs:aircraft turbine engines[R].R-1288-PR,1974
|
[16] |
徐哲,刘荣.偏最小二乘回归法在武器装备研制费用估算中的应用[J].数学的实践与认识,2005,35(3):152-158 Xu Zhe,Liu Rong.The application and research of PLS in estimating the cost of development in armament[J].Mathematics in Practice and Theory,2005,35(3):152-158(in Chinese)
|
[17] |
刘廷毅.航空发动机研制全寿命管理研究及建议[J].航空发动机,2012,38(1):1-6 Liu Tingyi.Research and suggestion of lifecycle management for aeroengine development[J].Aeroengine,2012,38(1):1-6(in Chinese)
|
[18] |
于芹章,张福元,艾克武,等.武器装备全寿命费用估算建模有关问题研究[J].装备指挥技术学院学报,2003,14(4):18-21 Yu Qinzhang,Zhang Fuyuan,Ai Kewu,et al.The related research on the problem of evaluation and model of weaponry life circle cost[J].Journal of the Academy of Equipment Command & Technology,2003,14(4):18-21(in Chinese)
|
[19] |
李波,许诚,王君珺.导弹武器系统采办费用估算有关问题分析[J].海军航空工程学院学报,2006,21(5):585-588 Li Bo,Xu Cheng,Wang Junjun.Analysis on estimates related problems in acquisition cost of missile weapon system[J].Journal of Naval Aeronautical Engineering Institute,2006,21(5):585-588(in Chinese)
|
[20] |
胡晓煜.未来军用航空发动机展望[J].国际航空,2005(5):54-56 Hu Xiaoyu.The future of military aero engine[J].International Aviation,2005(5):54-56(in Chinese)
|