[1] |
唐立新. 轧钢厂的精轧工序轧制批量调度的优化模型[J].东北大学学报(自然科学版),1998,19(6):624-626. TANG L X.Optimal model of rolling lot scheduling for the finishing operation in rolling mill[J].Journal of Northeastern University(Natural Science),1998,19(6):624-626(in Chinese).
|
[2] |
李铁克,郭冬芬. 基于约束满足的热轧批量计划模型与算法[J].控制与决策,2007,22(4):389-393. LI T K,GUO D F.Model and algorithm for hot-rolling batch plan based on constraint satisfaction[J].Control and Decision,2007,22(4):389-393(in Chinese).
|
[3] |
TANG L X, HUANG L.Optimal and near-optimal algorithm to rolling batch scheduling for seamless steel tube production[J].International Journal of Production Economics,2007,105(2):357-371.
|
[4] |
王欣,杨春华, 秦斌.棒线材轧制批量调度多目标混合优化[J].控制与决策,2006,21(9):996-1000. WANG X,YANG C H,QIN B.Multi-objective hybrid optimization of lot scheduling for bar mill process[J].Control and Decision,2006,21(9):996-1000(in Chinese).
|
[5] |
SBIHI M, VARNIER C.Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness[J].Computers & Industrial Engineering,2008,55(4):830-840.
|
[6] |
LOW C Y, JI M,HSU C J,et al.Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance[J].Applied Mathematical Modelling,2010,34(2):334-342.
|
[7] |
李琳,霍佳震. 钢管生产计划中的多目标柔性Job-shop调度问题[J].系统工程理论与实践,2009,29(8):117-126. LI L,HUO J Z.Multi-objective flexible Job-shop scheduling problem in steel tubes production[J].Systems Engineering-Theory & Practice,2009,29(8):117-126(in Chinese).
|
[8] |
LUO H, HUANG G Q,ZHANG Y F,et al.Hybrid flowshop scheduling with batch-discrete processors and machine maintenance in time windows[J].International Journal of Production Research,2011,49(6):1575-1603.
|
[9] |
JIA S J, YI J,YANG G K,et al.A multi-objective optimisation algorithm for the hot rolling batch scheduling problem[J].International Journal of Production Research,2013,51(3):667-681.
|
[10] |
SHAN D, XU A J,LU Y M,et al.Research on modeling and optimization algorithm for hot rolling batch planning of DHCR production[C]//Proceedings of International Asia Conference on Industrial Engineering and Management Innovation(IEMI2012).Berlin:Springer,2013:527-536.
|
[11] |
KENNEDY J, EBERHART R.Particle swarm optimization[C]//IEEE International Conference on Neural Networks,1995.Piscataway,NJ:IEEE,1995,4:1942-1948.
|
[12] |
TSENG C T, LIAO C J.A discrete particle swarm optimization for lot streaming flowshop scheduling problem[J].European Journal of Operational Research,2008,191(2):360-373.
|
[13] |
MOGHADDAM R T, AZARKISH M,BARKOUSARAIE A S.Solving a multi-objective job shop scheduling problem with sequence-dependent setup times by a pareto archive PSO combined with genetic operators and VNS[J].The International Journal of Advanced Manufacturing Technology,2011,53(5-8):733-750.
|
[14] |
李鹏,车阿大. 基于混沌遗传算法的自动化生产单元调度方法[J].系统工程,2008,26(11):75-80. LI P,CHE A D.Robotic cells scheduling based on chaos genetic algorithm[J].Systems Engineering,2008,26(11):75-80(in Chinese).
|
[15] |
DEB K, PRATAP A,AGARWAL S,et al.A fast and elitist multiobjective genetic algorithm:NSGA-Ⅱ[J].IEEE Transactions on Evolutionary Computation,2002,6(2):182-197.
|
[16] |
MOSLEHI G, MAHNAM M.A pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search[J].International Journal of Production Economics,2011,129(1):14-22.
|
[17] |
NIU Q,JIAO B, GU X S.Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time[J].Applied Mathematics and Computation,2008,205(1):148-158.
|
[18] |
LOW C Y, JI M,HSU C J,et al.Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance[J].Applied Mathematical Modeling,2010,34(2):334-342.
|