Post-evaluation index system for aero-engine R & D capacity building projects
-
摘要: 针对航空发动机研发能力建设项目的具体特点并基于一个两阶段的过程,建立了一套航空发动机研发能力建设项目后评价指标体系.通过对一般项目后评价指标体系的分析以及专家访谈建立一个初选的后评价指标体系;在此基础上,以指标精炼性、数据可获得性和实践可行性为原则,对初选指标进行优选.优选过程中,采用基于李克特量表的专家调查法获得专家评分,随后通过群组决策最大特征根法对初选指标体系进行初步筛选,并进一步根据统计学方法进行评价指标相关性分析筛选和评价指标鉴别能力筛选,从而确定最终指标.Abstract: According to the specific characteristics of R & D capacity building projects for aero-engines, and based on a two-stage process, a specific project evaluation index system was proposed for the post-evaluation of the aero-engine R & D capacity building projects. Firstly, a primary evaluation index system was established based on the analysis of general projects post evaluation index system and some expert interviews. In addition, an expert survey method based on Likert scale was applied to obtain the expert ratings of each index, and then the group eigenvalue method was selected for the siftings of the primary index system. Some further correlation analysis and resolution capability analysis were also realized by statistics methods to achieve a superior index system optimization.
-
Key words:
- project management /
- R & D capacity building /
- post-evaluation /
- index system /
- aero-engine
-
[1] 侯金晔,白思俊, 郭云涛.航空武器装备项目过程评估指标体系的构建[J].航空制造技术,2008(1):90-91 Hou Jinye,Bai Sijun,Guo Yuntao.Constitution of process evaluation index system for aerial weapon equipment project[J].Aeronautical Manufacturing Technology,2008(1):90-91(in Chinese) [2] 殷旭东, 汪恩华.武器装备动员能力评价的指标体系构建[J].统计与决策,2008(1):43-44 Yin Xudong,Wang Enhua.Construction of index system for evaluation of weapon equipment mobilization ability[J].Statistics and Decision,2008(1):43-44(in Chinese) [3] 张钦, 周德群.国防科技工业创新型企业评价研究[M].北京:科学出版社,2011 Zhang Qin,Zhou Dequn.Study on evaluation of innovative enterprises in the national defense industry[M].Beijing:Science Press,2011(in Chinese) [4] 苏为华. 多指标综合评价理论与方法问题研究[D].厦门:厦门大学,2000 Su Weihua.Research on theory and method of multi index comprehensive evaluation[D].Xiamen:Xiamen University,2000(in Chinese) [5] Geisler E. The metrics of science and technology[M].New York:Greenwood Press,2000 [6] 鲍玉昆, 张金隆,孙福全,等.基于SMART准则的科技项目评标指标体系结构模型设计[J].科学学与科学技术管理,2003(2):46-48 Bao Yukun,Zhang Jinlong,Sun Fuquan,et al.Design on smart-based s&t evaluation indicators system with three-layer classified structure[J].Science of Science and Management of S & T,2003(2):46-48(in Chinese) [7] 侯金晔. 航空武器装备项目过程评估研究[D].西安:西北工业大学,2007:27-28 Hou Jinye.Research on process evaluation for aerial weapon equipment project[D].Xi'an:Northwestern Polytechinical University,2007:27-28(in Chinese) [8] 邱苑华. 群组决策特征根法[J].应用数学和力学, 1997(11): 1027-1028 Qiu Wanhua.An enginvalue method on group decision[J].Applied Mathematics and Mechanics,1997(11):1027-1028(in Chinese) [9] 吴坚,梁昌勇,李绩才. 群决策中专家决策意见的可靠性研究[J].合肥工业大学学报:自然科学版,2009,32(3):366-367 Wu Jian,Liang Changyong,Li Jicai.Study on the reliability of group agreement under group decision making[J].Journal of Hefei University of Technology:Natural Science,2009,32(3):366-367(in Chinese) [10] 吴雷. 装备制造业企业持续创新能力评价:以黑龙江省为例[M].北京:经济科学出版社,2011:83-85 Wu Lei.Evaluation of innovation capability for equipment manufacturing enterprises: taking heilongjiang province as an example[M].Beijing:Economic Science Press,2011:83-85(in Chinese) [11] 姜喜龙. 国防工业企业自主创新能力体系构建与对策研究[D].哈尔滨:哈尔滨工程大学,2007:65-66 Jiang Xilong.Research on the construction of the defense industry enterprise s independent innovation ability system and corresponding countermeasures[D].Harbin:Harbin Engineering University,2007:65-66(in Chinese)
点击查看大图
计量
- 文章访问数: 1057
- HTML全文浏览量: 138
- PDF下载量: 477
- 被引次数: 0