[1] |
Barros L L. The optimization of repair decisions using life-cycle cost parameters[J].IMA Journal of Mathematics Applied in Business & Industry,1998,9(4):403-413.
|
[2] |
Barros L L, Riley M.A combinatorial approach to level of repair analysis[J].European Journal of Operational Research,2001,129(2):242-251.
|
[3] |
Gutin G, Rafiey A,Yeo A,et al.Level of repair analysis and minimum cost homeomorphisms of graphs[J].Discrete Applied Mathematics,2006,154(6):881-889.
|
[4] |
Saranga H, Kumar U D.Optimization of aircraft maintenance/support infrastructure using genetic algorithm-level of repair analysis[J].Annals of Operations Research,2006,143(1):91-106.
|
[5] |
Basten R J I, Schutten J M J,Heijden M C.An efficient model formulation for level of repair analysis[J].Annals of Operations Research,2009,172(1):119-142.
|
[6] |
Basten R J I, Heijden M C,Schutten J M J.An efficient model formulation for level of repair analysis[J].Annals of Operation Research,2009,172(1):119-142.
|
[7] |
Basten R J I, Van der Heijden M C,Schutten J M J.A minimum cost flow model for level of repair analysis[J].International Journal of Production Economics,2011,133(1):233-242.
|
[8] |
Sherbrooke C C. METRIC:a multi-echelon technique for recoverable item control [J].Operations Research,1968,16(1):122-141.
|
[9] |
Muckstadt J A. A model for a multi-item,multi-echelon,multi-indenture inventory system[J],Management Science,1973,20(4): 472-481.
|
[10] |
Graves S C. A multi-echelon inventory model for a repairable item with one-for-one replenishment[J].Management Science,1985,20(4):472-481.
|
[11] |
Sherbrooke C C. VARI-METRIC:improved approximations for recoverable item control[J].Operations Research,1986,34(2): 311-319.
|
[12] |
Axsater S. Simple solution procedures for a class of two-echelon inventory problem[J].Operations Research,1990,38(1):64- 69.
|
[13] |
Kim J S, Shin K C,Park S K.An algorithm for repairable item inventory system with depot spares and general repair time distribution[J].Applied Mathematical Modelling,2007,31(5):795-804.
|
[14] |
Alfredsson P. Optimization of multi-echelon repairable item inventory system with simultaneous location of repair facilities[J].European Journal of Operational Research,1997,99(3):584-595.
|
[15] |
Sleptchenko A, Heijden M C,Harten A.Trade-off between inventory and repair capacity in spare part networks[J].Journal of the Operations Research Society,2003,54(3):263-272.
|
[16] |
Basten R J I, Van der Heijden M C,Schutten J M J.Practical extensions to a minimum cost flow model for level of repair analysis[J].European Journal of Operational Research,2011,211(2):333-342.
|
[17] |
Basten R J I, Heijden M C,Schutten J M J.Joint optimization of level of repair analysis and spare stocks[J].European Journal of Operational Research,2012,222(3):474-483.
|
[18] |
Sherbrook C C. Optimal inventory modeling of systems:multi-echelon techniques[M].2rd ed.New York:Kluwer Academic Publishers,2004:22-22.
|