[1] |
ARMSTRONG M,ATKINS D.Joint optimization of maintenance and inventory policies for a simple system[J].IIE Transactions,1996,28(5):415-424.
|
[2] |
KABIR A B M Z,AHMED S A.A stocking policy for spare part provisioning under age based preventive replacement[J].European Journal of Operational Research,1996,90(1):171-181.
|
[3] |
ACHARYA D,NAGABHUSHANAM G,ALAM S.Jointly optimal block-replacement and spare provisioning policy[J].IEEE Transactions on Reliability,1986,35(4):447-451.
|
[4] |
CHELBI A,AIT-KADI D.Spare provisioning strategy for preventively replaced systems subjected to random failure[J].International Journal of Production Economics,2001,74(1-3):183-189.
|
[5] |
BREZAVSCEK A,HUDOKLIN A.Joint optimization of block-replacement and periodic-review spare-provisioning policy[J].IEEE Transactions on Reliability,2003,52(1):112-117.
|
[6] |
HUANG R Q,MENG L L,XI L F,et al.Modeling and analyzing a joint optimization policy of block-replacement and spare inventory with random leadtime[J].IEEE Transactions on Reliability,2008,57(1):113-124.
|
[7] |
PANAGIOTIDOU S.Joint optimization of spare parts ordering and maintenance policies for multiple identical items subject to silent failures[J].European Journal of Operational Research,2014,235(1):300-314.
|
[8] |
JIANG Y P,CHEN M Y,ZHOU D H.Joint optimization of preventive maintenance and inventory policies for multi-unit systems subject to deteriorating spare part inventory[J].Journal of Manufacturing Systems,2015,35(1):191-205.
|
[9] |
ARMSTRONG M J,ATKINS D A.A note on joint optimization of maintenance and inventory[J].IIE Transactions,1998,30(2):143-149.
|
[10] |
HU R,YUE C,XIE J.Joint optimization of age replacement and spare ordering policy based on genetic algorithm[C]//Proceedings of the 2008 International Conference on Computational Intelligence and Security.Piscataway,NJ:IEEE Press,2008:156-161.
|
[11] |
LYNCH P,ADENDORFF K,YADAVALLI V S S,et al.Optimal spares and preventive maintenance frequencies for constrained industrial systems[J].Computers & Industrial Engineering,2013,65(3):378-387.
|
[12] |
XIE J,WANG H.Joint optimization of condition-based preventive maintenance and spare ordering policy[C]//Proceedings of the 4th International Conference on Wireless Communications,Networking and Mobile Computing.Piscataway,NJ:IEEE Press,2008:6195-6199.
|
[13] |
WANG L,CHU J,MAO W.A condition-based order-replacement policy for a single-unit system[J].Applies Mathematical Modelling,2008,32(11):2274-2289.
|
[14] |
WANG L,CHU J,MAO W.An optimum condition-based replacement and spare provisioning policy based on Markov chains[J].Journal of Quality in Maintenance Engineering,2008,14(4):387-401.
|
[15] |
WANG L,CHU J,MAO W.A condition-based replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure[J].European Journal of Operational Research,2009,194(1):184-205.
|
[16] |
BJARNASON E T S,TAGHIPOUR S,BANJEVIC D.Joint optimal inspection and inventory for a k-out-of-n system[J].Reliability Engineering and System Safety,2014,131(3):203-215.
|
[17] |
DE SMIDT-DESTOMBES K S,VAN DER HEIJDEN M C,VAN HARTEN A.On the availability of a k-out-of-N system given limited spares and repair capacity under a condition based maintenance strategy[J].Reliability Engineering and System Safety,2004,83(3):287-300.
|
[18] |
DE SMIDT-DESTOMBES K S,VAN DER HEIJDEN M C,VAN HARTEN A.Joint optimisation of spare part inventory,maintenance frequency and repair capacity for k-out-of-N system[J].International Journal of Production Economics,2009,118(1):260-268.
|